• Welcome to TechPowerUp Forums, Guest! Please check out our forum guidelines for info related to our community.

India's Largest Nuclear Power Plant Denies Rumors of Cybersecurity Breach Stopping a Reactor

btarunr

Editor & Senior Moderator
Staff member
Joined
Oct 9, 2007
Messages
46,653 (7.66/day)
Location
Hyderabad, India
System Name RBMK-1000
Processor AMD Ryzen 7 5700G
Motherboard ASUS ROG Strix B450-E Gaming
Cooling DeepCool Gammax L240 V2
Memory 2x 8GB G.Skill Sniper X
Video Card(s) Palit GeForce RTX 2080 SUPER GameRock
Storage Western Digital Black NVMe 512GB
Display(s) BenQ 1440p 60 Hz 27-inch
Case Corsair Carbide 100R
Audio Device(s) ASUS SupremeFX S1220A
Power Supply Cooler Master MWE Gold 650W
Mouse ASUS ROG Strix Impact
Keyboard Gamdias Hermes E2
Software Windows 11 Pro
The Kudankulam Nuclear Power Plant (KKNPP) is India's largest, with two operational 1,000 MWe reactors, and four more under construction, making up a nameplate capacity of 6,000 MWe (electrical output) when fully built. Last Saturday (26th October), unit 2 was taken offline due to an "SG level low" (steam generator level low) error. This event, roughly coinciding with Twitter chatter on an alleged cyber-attack on the plant's computers on Tuesday, spread panic. Twitter threads from cyber-security handles chronicle a possible DTrack malware attack that gained access to the plant's domain controller.

On Tuesday, state-owned Nuclear Power Corporation of India (NPCIL), which operates KKNPP, put out a press-release denying these rumors. In the press release, plant spokesperson R. Ramdoss states that the plant's computers are isolated from the Internet, and that an external cyberattack is "impossible." He stated that Unit 2 was taken offline due to a mechanical problem in its turbine hall (levels of steam being too low to turn the turbine). It's important to understand that a "Unit" in power plant jargon is a combination of a reactor and its turbine hall. The reactor splits atoms to heat water and make steam, the turbine hall uses this steam to make electricity. A "unit" being offline doesn't necessary mean that its reactor is, but that it's simply not putting out power to the grid. Ramdoss stated that as of Tuesday, units 1 and 2 were putting out 1,000 MWe and 600 MWe, respectively.



Update (late-Wednesday, 10/30): NPCIL retracted its earlier statement denying a cyber-attack, and released another press-release, stating that one of its PCs in the plant's administrative block that was exposed to the Internet, was infected by malware, and is being cleaned. This PC is isolated from the plant's internal network that operates the various critical systems. The investigation also revealed that the plant's internal computers are unaffected. The new press-release is pictured above. From the looks of it, the operational error on Saturday is unrelated to the cyber-attack.

View at TechPowerUp Main Site
 

hat

Enthusiast
Joined
Nov 20, 2006
Messages
21,734 (3.39/day)
Location
Ohio
System Name Starlifter :: Dragonfly
Processor i7 2600k 4.4GHz :: i5 10400
Motherboard ASUS P8P67 Pro :: ASUS Prime H570-Plus
Cooling Cryorig M9 :: Stock
Memory 4x4GB DDR3 2133 :: 2x8GB DDR4 2400
Video Card(s) PNY GTX1070 :: Integrated UHD 630
Storage Crucial MX500 1TB, 2x1TB Seagate RAID 0 :: Mushkin Enhanced 60GB SSD, 3x4TB Seagate HDD RAID5
Display(s) Onn 165hz 1080p :: Acer 1080p
Case Antec SOHO 1030B :: Old White Full Tower
Audio Device(s) Creative X-Fi Titanium Fatal1ty Pro - Bose Companion 2 Series III :: None
Power Supply FSP Hydro GE 550w :: EVGA Supernova 550
Software Windows 10 Pro - Plex Server on Dragonfly
Benchmark Scores >9000
Even if such computers are isolated from the Internet (as they should be), it wouldn't be impossible that a bad actor may have physical access to these computers. Of course they would deny that it was attacked. That said, it's far more likely that they shut it down themselves due to mechanical issues, as their explanation says.
 

FordGT90Concept

"I go fast!1!11!1!"
Joined
Oct 13, 2008
Messages
26,259 (4.59/day)
Location
IA, USA
System Name BY-2021
Processor AMD Ryzen 7 5800X (65w eco profile)
Motherboard MSI B550 Gaming Plus
Cooling Scythe Mugen (rev 5)
Memory 2 x Kingston HyperX DDR4-3200 32 GiB
Video Card(s) AMD Radeon RX 7900 XT
Storage Samsung 980 Pro, Seagate Exos X20 TB 7200 RPM
Display(s) Nixeus NX-EDG274K (3840x2160@144 DP) + Samsung SyncMaster 906BW (1440x900@60 HDMI-DVI)
Case Coolermaster HAF 932 w/ USB 3.0 5.25" bay + USB 3.2 (A+C) 3.5" bay
Audio Device(s) Realtek ALC1150, Micca OriGen+
Power Supply Enermax Platimax 850w
Mouse Nixeus REVEL-X
Keyboard Tesoro Excalibur
Software Windows 10 Home 64-bit
Benchmark Scores Faster than the tortoise; slower than the hare.
Current nameplate capacity is 1864 MWe (2 x 1000 MWe gross from 2 x 3000 MW reactors). You can see in the picture that they're adding four more 1200 1000 MWe reactors. Units three and four (middle) have started construction.

The hackers may have gotten into the business side of the facility but, as they said, the systems controlling the reactors are offline.
 
Last edited:

btarunr

Editor & Senior Moderator
Staff member
Joined
Oct 9, 2007
Messages
46,653 (7.66/day)
Location
Hyderabad, India
System Name RBMK-1000
Processor AMD Ryzen 7 5700G
Motherboard ASUS ROG Strix B450-E Gaming
Cooling DeepCool Gammax L240 V2
Memory 2x 8GB G.Skill Sniper X
Video Card(s) Palit GeForce RTX 2080 SUPER GameRock
Storage Western Digital Black NVMe 512GB
Display(s) BenQ 1440p 60 Hz 27-inch
Case Corsair Carbide 100R
Audio Device(s) ASUS SupremeFX S1220A
Power Supply Cooler Master MWE Gold 650W
Mouse ASUS ROG Strix Impact
Keyboard Gamdias Hermes E2
Software Windows 11 Pro
Current nameplate capacity is 1864 MWe (2 x 1000 MWe gross from 2 x 3000 MW reactors). You can see in the picture that they're adding four more 1200 MWe reactors. Units three and four (middle) have started construction.

The hackers may have gotten into the business side of the facility but, as they said, the systems controlling the reactors are offline.

It's rumored that units 3~6 are going to be VVER-1200 instead of VVER-1000 (1 and 2), but the company never confirmed it. How could you tell they're 1200 MWe from that picture?
 

FordGT90Concept

"I go fast!1!11!1!"
Joined
Oct 13, 2008
Messages
26,259 (4.59/day)
Location
IA, USA
System Name BY-2021
Processor AMD Ryzen 7 5800X (65w eco profile)
Motherboard MSI B550 Gaming Plus
Cooling Scythe Mugen (rev 5)
Memory 2 x Kingston HyperX DDR4-3200 32 GiB
Video Card(s) AMD Radeon RX 7900 XT
Storage Samsung 980 Pro, Seagate Exos X20 TB 7200 RPM
Display(s) Nixeus NX-EDG274K (3840x2160@144 DP) + Samsung SyncMaster 906BW (1440x900@60 HDMI-DVI)
Case Coolermaster HAF 932 w/ USB 3.0 5.25" bay + USB 3.2 (A+C) 3.5" bay
Audio Device(s) Realtek ALC1150, Micca OriGen+
Power Supply Enermax Platimax 850w
Mouse Nixeus REVEL-X
Keyboard Tesoro Excalibur
Software Windows 10 Home 64-bit
Benchmark Scores Faster than the tortoise; slower than the hare.
It's rumored that units 3~6 are going to be VVER-1200 instead of VVER-1000 (1 and 2), but the company never confirmed it. How could you tell they're 1200 MWe from that picture?
Did some digging and it appears that they are, in fact, VVER-1000 units:
Having successfully accomplished the mission by operationalising the first two reactors, the KKNPP will now pay more attention for commencing the work on the construction of the third and fourth reactors, each with a capacity of 1,000 MWe, at an outlay of Rs. 39,500 crore.

The reason why I brought it up is because OP has "nameplate capacity of 6,000 MWe (electrical output)" which I think you were getting from when all six units are installed. Nameplate capacity goes by maximum amount of power the facility can safely supply to the grid which is 1864 MWe until reactors 3 & 4 are operational.
 

btarunr

Editor & Senior Moderator
Staff member
Joined
Oct 9, 2007
Messages
46,653 (7.66/day)
Location
Hyderabad, India
System Name RBMK-1000
Processor AMD Ryzen 7 5700G
Motherboard ASUS ROG Strix B450-E Gaming
Cooling DeepCool Gammax L240 V2
Memory 2x 8GB G.Skill Sniper X
Video Card(s) Palit GeForce RTX 2080 SUPER GameRock
Storage Western Digital Black NVMe 512GB
Display(s) BenQ 1440p 60 Hz 27-inch
Case Corsair Carbide 100R
Audio Device(s) ASUS SupremeFX S1220A
Power Supply Cooler Master MWE Gold 650W
Mouse ASUS ROG Strix Impact
Keyboard Gamdias Hermes E2
Software Windows 11 Pro
Did some digging and it appears that they are, in fact, VVER-1000 units:


The reason why I brought it up is because OP has "nameplate capacity of 6,000 MWe (electrical output)" which I think you were getting from when all six units are installed. Nameplate capacity goes by maximum amount of power the facility can safely supply to the grid which is 1864 MWe until reactors 3 & 4 are operational.

Ahh thanks, clarified that.

Updated with a flip-flop from NPCIL. They maintain this was an admin block PC that was connected to the Internet, and isolated from the actual computers that run the plant.
 
Top