• Welcome to TechPowerUp Forums, Guest! Please check out our forum guidelines for info related to our community.

TSMC Completes Its Latest 3 nm Factory, Mass Production in 2022

AleksandarK

News Editor
Staff member
Joined
Aug 19, 2017
Messages
2,582 (0.97/day)
They say that it is hard to keep up with Moore's Law, however, for the folks over at Taiwan Semiconductor Manufacturing Company (TSMC), that doesn't seem to represent any kind of a problem. Today, to confirm that TSMC is one of the last warriors for the life of Moore's Law, we have information that the company has completed building its manufacturing facility for the next-generation 3 nm semiconductor node. Located in Southern Taiwan Science Park near Tainan, TSMC is expecting to start high-volume manufacturing of the 3 nm node in that Fab in the second half of 2022. As always, one of the first customers expected is Apple.

Estimated to cost an amazing 19.5 billion US Dollars, the Fab is expected to have an output of 55,000 300 mm (12-inch) wafers per month. Given that the regular facilities of TSMC exceed the capacity of over 100K wafers per month, this new facility is expected to increase the capacity over time and possibly reach the 100K level. The new 3 nm node is going to use the FinFET technology and will deliver a 15% performance gain over the previous 5 nm node, with 30% decreased power use and up to 70% density increase. Of course, all of those factors will depend on a specific design.


View at TechPowerUp Main Site
 
Joined
Jan 8, 2017
Messages
9,435 (3.28/day)
System Name Good enough
Processor AMD Ryzen R9 7900 - Alphacool Eisblock XPX Aurora Edge
Motherboard ASRock B650 Pro RS
Cooling 2x 360mm NexXxoS ST30 X-Flow, 1x 360mm NexXxoS ST30, 1x 240mm NexXxoS ST30
Memory 32GB - FURY Beast RGB 5600 Mhz
Video Card(s) Sapphire RX 7900 XT - Alphacool Eisblock Aurora
Storage 1x Kingston KC3000 1TB 1x Kingston A2000 1TB, 1x Samsung 850 EVO 250GB , 1x Samsung 860 EVO 500GB
Display(s) LG UltraGear 32GN650-B + 4K Samsung TV
Case Phanteks NV7
Power Supply GPS-750C
As always, one of the first customers expected is Apple.

Are they ? I thought they were supposedly switching to Samsung, things didn't quite turn out the way the wanted to, huh ?
 

Space Lynx

Astronaut
Joined
Oct 17, 2014
Messages
17,210 (4.66/day)
Location
Kepler-186f
If they can build a 3nm fab and it's already done, why build a 5nm one Arizona where construction just started... I don't care who the customer is, it doesn't make sense... lol
 

AleksandarK

News Editor
Staff member
Joined
Aug 19, 2017
Messages
2,582 (0.97/day)
Are they ? I thought they were supposedly switching to Samsung, things didn't quite turn out the way the wanted to, huh ?
Apple might expand to Samsung as well, but TSMC is its primary manufacturer.

If they can build a 3nm fab and it's already done, why build a 5nm one Arizona where construction just started... I don't care who the customer is, it doesn't make sense... lol
It is TSMC's entry to US soils, the 5 nm node is already in production in Taiwan, where Apple gets its M1 chips from. It is just a Fab on US soils.
 

Space Lynx

Astronaut
Joined
Oct 17, 2014
Messages
17,210 (4.66/day)
Location
Kepler-186f
Apple might expand to Samsung as well, but TSMC is its primary manufacturer.


It is TSMC's entry to US soils, the 5 nm node is already in production in Taiwan, where Apple gets its M1 chips from. It is just a Fab on US soils.


I still don't get it. If you are a for-profit business, then you go balls to the walls as soon as your engineers give you the thumbs up, and you rake in the $$$$$ If 3nm is greenlit, and it apparently is, then you go full pedal to the medal on it on a new construction project. The world doesn't have enough natural resources left to keep playing milking games.
 

AleksandarK

News Editor
Staff member
Joined
Aug 19, 2017
Messages
2,582 (0.97/day)
I still don't get it. If you are a for-profit business, then you go balls to the walls as soon as your engineers give you the thumbs up, and you rake in the $$$$$ If 3nm is greenlit, and it apparently is, then you go full pedal to the medal on it on a new construction project. The world doesn't have enough natural resources left to keep playing milking games.
The Arizona fab is built so it can be close to US and maybe used by the government, it doesn’t matter what is the technology, but rather the political impact TSMC.
 
Joined
Jul 9, 2015
Messages
3,413 (1.00/day)
System Name M3401 notebook
Processor 5600H
Motherboard NA
Memory 16GB
Video Card(s) 3050
Storage 500GB SSD
Display(s) 14" OLED screen of the laptop
Software Windows 10
Benchmark Scores 3050 scores good 15-20% lower than average, despite ASUS's claims that it has uber cooling.
Joined
Jan 8, 2017
Messages
9,435 (3.28/day)
System Name Good enough
Processor AMD Ryzen R9 7900 - Alphacool Eisblock XPX Aurora Edge
Motherboard ASRock B650 Pro RS
Cooling 2x 360mm NexXxoS ST30 X-Flow, 1x 360mm NexXxoS ST30, 1x 240mm NexXxoS ST30
Memory 32GB - FURY Beast RGB 5600 Mhz
Video Card(s) Sapphire RX 7900 XT - Alphacool Eisblock Aurora
Storage 1x Kingston KC3000 1TB 1x Kingston A2000 1TB, 1x Samsung 850 EVO 250GB , 1x Samsung 860 EVO 500GB
Display(s) LG UltraGear 32GN650-B + 4K Samsung TV
Case Phanteks NV7
Power Supply GPS-750C
@Vya Domus ,

could you help me estimate number of RDNA2/Zen3 chips per wafer?
Asking fecause:


Hard to tell exactly but with the rumored defect density and size per chip it must be around 60 Navi21 good chips per wafer +/- 5 out of 96 but the number of useful dies is higher because some can be reused. Anyway I speculated a long time ago there wont be many RDNA2 chips out there because of this reason (consoles and servers).

As far as NVIDIA goes, it could be as low as 35 GA102 dies per wafer out of 79, but those are fully functional and NVIDIA currently only has Quadros using the fully enabled die. My guess is that the yields are probably even worse.
 
Last edited:
Joined
Nov 26, 2020
Messages
106 (0.07/day)
Location
Germany
System Name Meeeh
Processor 8700K at 5.2 GHz
Memory 32 GB 3600/CL15
Video Card(s) Asus RTX 3080 TUF OC @ +175 MHz
Storage 1TB Samsung 970 Evo Plus
Display(s) 1440p, 165 Hz, IPS
So this means Apple SoCs will be 3nm in 2022
 
Joined
May 31, 2016
Messages
4,437 (1.43/day)
Location
Currently Norway
System Name Bro2
Processor Ryzen 5800X
Motherboard Gigabyte X570 Aorus Elite
Cooling Corsair h115i pro rgb
Memory 32GB G.Skill Flare X 3200 CL14 @3800Mhz CL16
Video Card(s) Powercolor 6900 XT Red Devil 1.1v@2400Mhz
Storage M.2 Samsung 970 Evo Plus 500MB/ Samsung 860 Evo 1TB
Display(s) LG 27UD69 UHD / LG 27GN950
Case Fractal Design G
Audio Device(s) Realtec 5.1
Power Supply Seasonic 750W GOLD
Mouse Logitech G402
Keyboard Logitech slim
Software Windows 10 64 bit
I still don't get it. If you are a for-profit business, then you go balls to the walls as soon as your engineers give you the thumbs up, and you rake in the $$$$$ If 3nm is greenlit, and it apparently is, then you go full pedal to the medal on it on a new construction project. The world doesn't have enough natural resources left to keep playing milking games.
You can go 3nm when you get customers and you give them reasonable price. Apparently the price for the 3nm node is not that cheap as of now besides there is still huge demand for the 7nm node. Why force 3nm when you still get piles of money from 7nm?
 
Joined
Feb 3, 2017
Messages
3,748 (1.32/day)
Processor Ryzen 7800X3D
Motherboard ROG STRIX B650E-F GAMING WIFI
Memory 2x16GB G.Skill Flare X5 DDR5-6000 CL36 (F5-6000J3636F16GX2-FX5)
Video Card(s) INNO3D GeForce RTX™ 4070 Ti SUPER TWIN X2
Storage 2TB Samsung 980 PRO, 4TB WD Black SN850X
Display(s) 42" LG C2 OLED, 27" ASUS PG279Q
Case Thermaltake Core P5
Power Supply Fractal Design Ion+ Platinum 760W
Mouse Corsair Dark Core RGB Pro SE
Keyboard Corsair K100 RGB
VR HMD HTC Vive Cosmos
could you help me estimate number of RDNA2/Zen3 chips per wafer?
Zen3: 83.736 mm² (11.270 x 7.430 mm) (link)
Navi21: 519.8 mm² (28.49 x 18.25 mm)

Die Yield Calculator: https://caly-technologies.com/die-yield-calculator/
Wafer Diameter for 7nm should be 300mm.
Defect Density was 0.09 last time it leaked, it may have improved but not by much.

Zen3: 694 dies total, 644 good dies (with defect density 0.09)
Navi21: 107 dies total, 68 good dies (with defect density 0.09)

In addition to Zen3 and Navi21, there is the die MI100 is based on that is definitely not small or easy to produce (but I bet is very profitable).

TSMC 7nm capacity is 130K wafers/month, planned to increase to 140K wafers/month by end of 2020.
Based on various news/leak/rumor bits AMD at this point has about 60-65% of that capacity, lets say roughly 80K wafers/month.

- From Sony's planned at least 7 million PS5s manufactured in this year and knowing the rough size of the PS5 APU, they need at least 15K wafers/month to get these manufactured. This is probably an optimistic number, assuming perfect yields (leaks/rumors say are yields are not quite good), 20-25 K wafers/month sounds realistic.
- Xbox is probably in the same range. Microsoft has not been public about the amount manufactured but I bet it will not be much less. Xbox APU is bigger, so less per wafer and probably slightly worse yields. That's another 20-25K wafers/month.
- Since neither Sony nor Microsoft are listed as big TSMC customers, that must be coming out of AMD's 7nm allocation. Basically - half or more of AMD's TSMC 7nm allocation goes to manufacturing console APUs at this point. Numbers are assuming equal manufactured amounts of APUs over 2020-H2.

Edit:
Aaaand... I do read the referenced news bit but do not register any of it somehow.
Wafer amounts in the news:
- 150K/quarter is 50k/month. Less than I expected.
- 120K/quarter - 40k/month. Close enough to what I expected but there are about half as much Xbox APUs produced than PS5.
 
Last edited:
Joined
Nov 26, 2020
Messages
106 (0.07/day)
Location
Germany
System Name Meeeh
Processor 8700K at 5.2 GHz
Memory 32 GB 3600/CL15
Video Card(s) Asus RTX 3080 TUF OC @ +175 MHz
Storage 1TB Samsung 970 Evo Plus
Display(s) 1440p, 165 Hz, IPS
Apple might expand to Samsung as well, but TSMC is its primary manufacturer.


It is TSMC's entry to US soils, the 5 nm node is already in production in Taiwan, where Apple gets its M1 chips from. It is just a Fab on US soils.

Apple is TSMC's highest priority and best customer

Apple gets exclusity on all new nodes, for months and months before anyone else can get in
 

Frick

Fishfaced Nincompoop
Joined
Feb 27, 2006
Messages
19,565 (2.86/day)
Location
Piteå
System Name White DJ in Detroit
Processor Ryzen 5 5600
Motherboard Asrock B450M-HDV
Cooling Be Quiet! Pure Rock 2
Memory 2 x 16GB Kingston Fury 3400mhz
Video Card(s) XFX 6950XT Speedster MERC 319
Storage Kingston A400 240GB | WD Black SN750 2TB |WD Blue 1TB x 2 | Toshiba P300 2TB | Seagate Expansion 8TB
Display(s) Samsung U32J590U 4K + BenQ GL2450HT 1080p
Case Fractal Design Define R4
Audio Device(s) Plantronics 5220, Nektar SE61 keyboard
Power Supply Corsair RM850x v3
Mouse Logitech G602
Keyboard Cherry MX Board 1.0 TKL Brown
Software Windows 10 Pro
Benchmark Scores Rimworld 4K ready!
If they can build a 3nm fab and it's already done, why build a 5nm one Arizona where construction just started... I don't care who the customer is, it doesn't make sense... lol

Not everything has to be bleeding edge. There's many, many, many things that does fine on even >20nm.
 
Joined
Nov 26, 2020
Messages
106 (0.07/day)
Location
Germany
System Name Meeeh
Processor 8700K at 5.2 GHz
Memory 32 GB 3600/CL15
Video Card(s) Asus RTX 3080 TUF OC @ +175 MHz
Storage 1TB Samsung 970 Evo Plus
Display(s) 1440p, 165 Hz, IPS
If they can build a 3nm fab and it's already done, why build a 5nm one Arizona where construction just started... I don't care who the customer is, it doesn't make sense... lol

More advanced = more expensive (both the facility and the end-chips)
 

HTC

Joined
Apr 1, 2008
Messages
4,664 (0.77/day)
Location
Portugal
System Name HTC's System
Processor Ryzen 5 5800X3D
Motherboard Asrock Taichi X370
Cooling NH-C14, with the AM4 mounting kit
Memory G.Skill Kit 16GB DDR4 F4 - 3200 C16D - 16 GTZB
Video Card(s) Sapphire Pulse 6600 8 GB
Storage 1 Samsung NVMe 960 EVO 250 GB + 1 3.5" Seagate IronWolf Pro 6TB 7200RPM 256MB SATA III
Display(s) LG 27UD58
Case Fractal Design Define R6 USB-C
Audio Device(s) Onboard
Power Supply Corsair TX 850M 80+ Gold
Mouse Razer Deathadder Elite
Software Ubuntu 20.04.6 LTS
The new 3 nm node is going to use the FinFET technology and will deliver a 15% performance gain over the previous 5 nm node, with 30% decreased power use and up to 70% density increase. Of course, all of those factors will depend on a specific design.

As we know, since the introduction of 7nm we've been having hot spots where heat concentrates to high degree: a perfect example being the 5800X, which is much hotter than the 5950X (though the base clock of 5950X being lower is a variable to be considered), even though the 5950X is essentially twice the 5800X (minus one extra IO die, ofc). This happens because the heat is spread to a wider area so the cooler does it's job better on the 5950X VS the 5800X.

But if we increase the density further? How does that affect cooling capability? And it's up to 70% increase OVER 5NM, not 7nm, which may well further "aggravate the issue".

Are our coolers about to become obsolete due to being unable to deal with the concentration of heat on such small points of the CPUs?
 
Joined
Jul 9, 2015
Messages
3,413 (1.00/day)
System Name M3401 notebook
Processor 5600H
Motherboard NA
Memory 16GB
Video Card(s) 3050
Storage 500GB SSD
Display(s) 14" OLED screen of the laptop
Software Windows 10
Benchmark Scores 3050 scores good 15-20% lower than average, despite ASUS's claims that it has uber cooling.
Apple gets exclusity on all new nodes, for months and months before anyone else can get in
Say exactly 0 reliable sources.

And on "most valuable", Apple needs tens of millions of... quite small chips.
While AMD needs tens of millions of much larger ones. (40 million for consoles alone, and those are 330mm+)

I doubt Apple would use more wafers in 2021 than AMD.

Hard to tell exactly but with the rumored defect density and size per chip it must be around 60 Navi21 good chips per wafer +/- 5 out of 96 but the number of useful dies is higher because some can be reused. Anyway I speculated a long time ago there wont be many RDNA2 chips out there because of this reason (consoles and servers).

As far as NVIDIA goes, it could be as low as 35 GA102 dies per wafer out of 79, but those are fully functional and NVIDIA currently only has Quadros using the fully enabled die. My guess is that the yields are probably even worse.
Zen3: 694 dies total, 644 good dies (with defect density 0.09)
Navi21: 107 dies total, 68 good dies (with defect density 0.09)


Hooooold on, guys. A 300mm wafer costs around $17k.
If one is only after "big boys", it's 17000/68 = 250 bucks just for RDNA2 chip!
Compared to $27 for Zen3.


Yikes. CPUs seem to be vastly overpriced, while pricing of GPUs rather modest.
 
Joined
Oct 18, 2013
Messages
6,186 (1.53/day)
Location
Over here, right where you least expect me to be !
System Name The Little One
Processor i5-11320H @4.4GHZ
Motherboard AZW SEI
Cooling Fan w/heat pipes + side & rear vents
Memory 64GB Crucial DDR4-3200 (2x 32GB)
Video Card(s) Iris XE
Storage WD Black SN850X 4TB m.2, Seagate 2TB SSD + SN850 4TB x2 in an external enclosure
Display(s) 2x Samsung 43" & 2x 32"
Case Practically identical to a mac mini, just purrtier in slate blue, & with 3x usb ports on the front !
Audio Device(s) Yamaha ATS-1060 Bluetooth Soundbar & Subwoofer
Power Supply 65w brick
Mouse Logitech MX Master 2
Keyboard Logitech G613 mechanical wireless
Software Windows 10 pro 64 bit, with all the unnecessary background shitzu turned OFF !
Benchmark Scores PDQ
You can go 3nm when you get customers and you give them reasonable price. Apparently the price for the 3nm node is not that cheap as of now besides there is still huge demand for the 7nm node. Why force 3nm when you still get piles of money from 7nm?

A) You can bet your arse they would not be moving ahead with 3nm if they didn't already have customers lined up for them, or at least some solid RFQ's (request for quotation) from some big named customers...

B) Prices are always high when production starts, and goes down once it ramps up into stable, QA/QC'd mass-production quantities... a known fact for any mfgr, silicon chips or otherwise....

C) With the extremely long lead times required to finance, build and start up a new fab shop, TSMC knows they absolutely CANNOT wait for 7nm, or even 5nm, orders to start declining before they make plans for the next big thing.... they MUST stay ahead of the curve, or risk losing their leading position to someone else...

Yes they will continue producing & selling older/larger nodes until nobody wants any significant qty's of them anymore, but that time is coming sooner rather than later, and they don't wanna be caught unprepared....

as the old saying goes: "Failure to plan on your end does NOT constitute an emergency on ours" hehehehe :roll:

I say: GO TSMC !!!!!
 
Joined
Feb 3, 2017
Messages
3,748 (1.32/day)
Processor Ryzen 7800X3D
Motherboard ROG STRIX B650E-F GAMING WIFI
Memory 2x16GB G.Skill Flare X5 DDR5-6000 CL36 (F5-6000J3636F16GX2-FX5)
Video Card(s) INNO3D GeForce RTX™ 4070 Ti SUPER TWIN X2
Storage 2TB Samsung 980 PRO, 4TB WD Black SN850X
Display(s) 42" LG C2 OLED, 27" ASUS PG279Q
Case Thermaltake Core P5
Power Supply Fractal Design Ion+ Platinum 760W
Mouse Corsair Dark Core RGB Pro SE
Keyboard Corsair K100 RGB
VR HMD HTC Vive Cosmos
Hooooold on, guys. A 300mm wafer costs around $17k.
Based on analytics and rumors per wafer cost is roughly:
  • 7nm ~$10k
  • 10nm (Samsung 8N is in this class) $7-8k
  • 12-16nm ~$6k
Of course, big customers have some negotiating space for discounts.
7-8 times difference in the amount of dies of CPUs and GPUs possibly retrieved from a wafer is no joke. Building a video card is also more complex and expensive than a CPU.
 
Joined
Mar 10, 2010
Messages
11,878 (2.21/day)
Location
Manchester uk
System Name RyzenGtEvo/ Asus strix scar II
Processor Amd R5 5900X/ Intel 8750H
Motherboard Crosshair hero8 impact/Asus
Cooling 360EK extreme rad+ 360$EK slim all push, cpu ek suprim Gpu full cover all EK
Memory Corsair Vengeance Rgb pro 3600cas14 16Gb in four sticks./16Gb/16GB
Video Card(s) Powercolour RX7900XT Reference/Rtx 2060
Storage Silicon power 2TB nvme/8Tb external/1Tb samsung Evo nvme 2Tb sata ssd/1Tb nvme
Display(s) Samsung UAE28"850R 4k freesync.dell shiter
Case Lianli 011 dynamic/strix scar2
Audio Device(s) Xfi creative 7.1 on board ,Yamaha dts av setup, corsair void pro headset
Power Supply corsair 1200Hxi/Asus stock
Mouse Roccat Kova/ Logitech G wireless
Keyboard Roccat Aimo 120
VR HMD Oculus rift
Software Win 10 Pro
Benchmark Scores 8726 vega 3dmark timespy/ laptop Timespy 6506
Well done ,the sooner apple and mobile move to 3nm the sooner others get 5nm starts.
 
Joined
May 31, 2016
Messages
4,437 (1.43/day)
Location
Currently Norway
System Name Bro2
Processor Ryzen 5800X
Motherboard Gigabyte X570 Aorus Elite
Cooling Corsair h115i pro rgb
Memory 32GB G.Skill Flare X 3200 CL14 @3800Mhz CL16
Video Card(s) Powercolor 6900 XT Red Devil 1.1v@2400Mhz
Storage M.2 Samsung 970 Evo Plus 500MB/ Samsung 860 Evo 1TB
Display(s) LG 27UD69 UHD / LG 27GN950
Case Fractal Design G
Audio Device(s) Realtec 5.1
Power Supply Seasonic 750W GOLD
Mouse Logitech G402
Keyboard Logitech slim
Software Windows 10 64 bit
You can bet your arse they would not be moving ahead with 3nm if they didn't already have customers lined up for them, or at least some solid RFQ's (request for quotation) from some big named customers...
Sure they do but they wont do it now starting from 2022.
B) Prices are always high when production starts, and goes down once it ramps up into stable, QA/QC'd mass-production quantities... a known fact for any mfgr, silicon chips or otherwise....
Sure they are high at the beginning but if they were to move for it now they would have been enormously huge. There's a reason why the production starts in 2022.
C) With the extremely long lead times required to finance, build and start up a new fab shop, TSMC knows they absolutely CANNOT wait for 7nm, or even 5nm, orders to start declining before they make plans for the next big thing.... they MUST stay ahead of the curve, or risk losing their leading position to someone else...
I don't think so. With the current demand we see there is no reason to go 3nm now. Plan ahead and get the environment ready for it. even if we hit 2022 I can assure you there will be a lot of 7nm fabs around. Besides. What TSMC is currently buying for new fabs, the machines can work as 5nm and 3nm. So it is a matter of converting the fabs if the 3nm hit high demand and 7nm clients would want to move for a smaller node.

Hell yeah go TSMC. This company is progressing faster and faster every year. I like what TSMC is doing and thumbs up for them.
 
Joined
Apr 12, 2013
Messages
7,528 (1.77/day)
Yikes. CPUs seem to be vastly overpriced, while pricing of GPUs rather modest.
Well tbf the most expensive GPU chips vastly outstrip(?) the most expensive CPU, the margins on enterprise or HPC cards are insane.
 
Joined
Jul 16, 2014
Messages
8,198 (2.17/day)
Location
SE Michigan
System Name Dumbass
Processor AMD Ryzen 7800X3D
Motherboard ASUS TUF gaming B650
Cooling Artic Liquid Freezer 2 - 420mm
Memory G.Skill Sniper 32gb DDR5 6000
Video Card(s) GreenTeam 4070 ti super 16gb
Storage Samsung EVO 500gb & 1Tb, 2tb HDD, 500gb WD Black
Display(s) 1x Nixeus NX_EDG27, 2x Dell S2440L (16:9)
Case Phanteks Enthoo Primo w/8 140mm SP Fans
Audio Device(s) onboard (realtek?) - SPKRS:Logitech Z623 200w 2.1
Power Supply Corsair HX1000i
Mouse Steeseries Esports Wireless
Keyboard Corsair K100
Software windows 10 H
Benchmark Scores https://i.imgur.com/aoz3vWY.jpg?2
If they can build a 3nm fab and it's already done, why build a 5nm one Arizona where construction just started... I don't care who the customer is, it doesn't make sense... lol
I expect building there to stop once the presidency changes hands.
 
Joined
Apr 12, 2013
Messages
7,528 (1.77/day)
If they can find enough customers to make it financially viable then why not? The DoD could be one & of course Intel :D
 
Joined
Jul 16, 2014
Messages
8,198 (2.17/day)
Location
SE Michigan
System Name Dumbass
Processor AMD Ryzen 7800X3D
Motherboard ASUS TUF gaming B650
Cooling Artic Liquid Freezer 2 - 420mm
Memory G.Skill Sniper 32gb DDR5 6000
Video Card(s) GreenTeam 4070 ti super 16gb
Storage Samsung EVO 500gb & 1Tb, 2tb HDD, 500gb WD Black
Display(s) 1x Nixeus NX_EDG27, 2x Dell S2440L (16:9)
Case Phanteks Enthoo Primo w/8 140mm SP Fans
Audio Device(s) onboard (realtek?) - SPKRS:Logitech Z623 200w 2.1
Power Supply Corsair HX1000i
Mouse Steeseries Esports Wireless
Keyboard Corsair K100
Software windows 10 H
Benchmark Scores https://i.imgur.com/aoz3vWY.jpg?2
Yes they will continue producing & selling older/larger nodes until nobody wants any significant qty's of them anymore, but that time is coming sooner rather than later,
that depends on what is ordered, they will still produce some wafers but very little amount
 

silentbogo

Moderator
Staff member
Joined
Nov 20, 2013
Messages
5,540 (1.38/day)
Location
Kyiv, Ukraine
System Name WS#1337
Processor Ryzen 7 5700X3D
Motherboard ASUS X570-PLUS TUF Gaming
Cooling Xigmatek Scylla 240mm AIO
Memory 4x8GB Samsung DDR4 ECC UDIMM
Video Card(s) MSI RTX 3070 Gaming X Trio
Storage ADATA Legend 2TB + ADATA SX8200 Pro 1TB
Display(s) Samsung U24E590D (4K/UHD)
Case ghetto CM Cosmos RC-1000
Audio Device(s) ALC1220
Power Supply SeaSonic SSR-550FX (80+ GOLD)
Mouse Logitech G603
Keyboard Modecom Volcano Blade (Kailh choc LP)
VR HMD Google dreamview headset(aka fancy cardboard)
Software Windows 11, Ubuntu 24.04 LTS
Are they ? I thought they were supposedly switching to Samsung, things didn't quite turn out the way the wanted to, huh ?
With 6/7nm, only because TSMC's current capacity is stretched. With 3nm they can book it upfront before anyone even has a chance to figure out what they are gonna use it for.

If they can build a 3nm fab and it's already done, why build a 5nm one Arizona where construction just started... I don't care who the customer is, it doesn't make sense... lol
1) it's not the primary purpose of building fab in AZ, same as Intel's Fab 42.
2) You can build a 28nm or 40nm fab and still make a killer buck on it, there's always market for it and not many entities (e.g. companies or countries) that can build a functioning profitable fab. As an example - Russia still can't scale up 45nm past tiny microcontrollers and NFC chips, that's why Elbrus was built on 65nm and later outsourced to 28nm TSMC. That's regardless of billions in investments and tons of additional govt. money and ridiculous exclusive military contracts, all driven by crazy demand on the local market. Another good example is Allwinner. They still use TSMC's 28nm capacities, and their SoCs are still widely used in STBs, mediaplayers, tablets. Mediatek is always two steps behind in fabrication process, but they are still making the most popular SoCs on smartphone market, only second to Qualcomm.
 
Top