TheMailMan78
Big Member
- Joined
- Jun 3, 2007
- Messages
- 22,599 (3.53/day)
- Location
- 'Merica. The Great SOUTH!
System Name | TheMailbox 5.0 / The Mailbox 4.5 |
---|---|
Processor | RYZEN 1700X / Intel i7 2600k @ 4.2GHz |
Motherboard | Fatal1ty X370 Gaming K4 / Gigabyte Z77X-UP5 TH Intel LGA 1155 |
Cooling | MasterLiquid PRO 280 / Scythe Katana 4 |
Memory | ADATA RGB 16GB DDR4 2666 16-16-16-39 / G.SKILL Sniper Series 16GB DDR3 1866: 9-9-9-24 |
Video Card(s) | MSI 1080 "Duke" with 8Gb of RAM. Boost Clock 1847 MHz / ASUS 780ti |
Storage | 256Gb M4 SSD / 128Gb Agelity 4 SSD , 500Gb WD (7200) |
Display(s) | LG 29" Class 21:9 UltraWide® IPS LED Monitor 2560 x 1080 / Dell 27" |
Case | Cooler Master MASTERBOX 5t / Cooler Master 922 HAF |
Audio Device(s) | Realtek ALC1220 Audio Codec / SupremeFX X-Fi with Bose Companion 2 speakers. |
Power Supply | Seasonic FOCUS Plus Series SSR-750PX 750W Platinum / SeaSonic X Series X650 Gold |
Mouse | SteelSeries Sensei (RAW) / Logitech G5 |
Keyboard | Razer BlackWidow / Logitech (Unknown) |
Software | Windows 10 Pro (64-bit) |
Benchmark Scores | Benching is for bitches. |
NVIDIA seems to be playing the blame game according to a article over at Xbit. This is what they had to say, "Chief executive officer of NVIDIA Corp. said that besides continuously increasing capital expenditures that the company ran into in the recent months will be accompanied by lower than expected gross margins in the forthcoming quarter. The company blames low yields of the next-generation code-named Kepler graphics chips that are made at TSMC's 28nm node. "Decline [of gross margin] in Q1 is expected to be due to the hard disk drive shortage continuing, as well as a shortage of 28nm wafers. We are ramping our Kepler generation very hard, and we could use more wafers. The gross margin decline is contributed almost entirely to the yields of 28nm being lower than expected. That is, I guess, unsurprising at this point," said Jen-Hsun Huang, chief executive officer of NVIDIA, during a conference call with financial analysts.
NVIDIA's operating expenses have been increasing for about a year now: from $329.6 million in Q1 FY2012 to $367.7 million in Q4 FY2012 and expects OpEx to be around $383 million in the ongoing Q1 FY2013. At the same time, the company expects its gross margins in Q1 FY2013 to decline below 50% for the first time in many quarters to 49.2%. Nvidia has very high expectations for its Kepler generation of graphics processing units (GPUs). The company claims that it had signed contracts to supply mobile versions of GeForce "Kepler" chips with every single PC OEM in the world. In fact, NVIDIA says Kepler is the best graphics processor ever designed by the company. [With Kepler, we] won design wins at virtually every single PC OEM in the world. So, this is probably the best GPU we have ever built and the performance and power efficiency is surely the best that we have ever created," said Mr. Huang.
Unfortunately for NVIDIA, yields of Kepler are lower than the company originally anticipated and therefore their costs are high. Chief exec of NVIDIA remains optimistic and claims that the situation with Fermi ramp up was ever worse than that. "We use wafer-based pricing now, when the yield is lower, our cost is higher. We have transitioned to a wafer-based pricing for some time and our expectation, of course, is that the yields will improve as they have in the previous generation nodes, and as the yields improve, our output would increase and our costs will decline," stated the head of NVIDIA.
Kepler is NVIDIA's next-generation graphics processor architecture that is projected to bring considerable performance improvements and will likely make the GPU more flexible in terms of programmability, which will speed up development of applications that take advantage of GPGPU (general purpose processing on GPU) technologies. Some of the technologies that NVIDIA promised to introduce in Kepler and Maxwell (the architecture that will succeed Kepler) include virtual memory space (which will allow CPUs and GPUs to use the "unified" virtual memory), pre-emption, enhance the ability of GPU to autonomously process the data without the help of CPU and so on. Entry-level chips may not get all the features that Kepler architecture will have to offer."
View at TechPowerUp Main Site
NVIDIA's operating expenses have been increasing for about a year now: from $329.6 million in Q1 FY2012 to $367.7 million in Q4 FY2012 and expects OpEx to be around $383 million in the ongoing Q1 FY2013. At the same time, the company expects its gross margins in Q1 FY2013 to decline below 50% for the first time in many quarters to 49.2%. Nvidia has very high expectations for its Kepler generation of graphics processing units (GPUs). The company claims that it had signed contracts to supply mobile versions of GeForce "Kepler" chips with every single PC OEM in the world. In fact, NVIDIA says Kepler is the best graphics processor ever designed by the company. [With Kepler, we] won design wins at virtually every single PC OEM in the world. So, this is probably the best GPU we have ever built and the performance and power efficiency is surely the best that we have ever created," said Mr. Huang.
Unfortunately for NVIDIA, yields of Kepler are lower than the company originally anticipated and therefore their costs are high. Chief exec of NVIDIA remains optimistic and claims that the situation with Fermi ramp up was ever worse than that. "We use wafer-based pricing now, when the yield is lower, our cost is higher. We have transitioned to a wafer-based pricing for some time and our expectation, of course, is that the yields will improve as they have in the previous generation nodes, and as the yields improve, our output would increase and our costs will decline," stated the head of NVIDIA.
Kepler is NVIDIA's next-generation graphics processor architecture that is projected to bring considerable performance improvements and will likely make the GPU more flexible in terms of programmability, which will speed up development of applications that take advantage of GPGPU (general purpose processing on GPU) technologies. Some of the technologies that NVIDIA promised to introduce in Kepler and Maxwell (the architecture that will succeed Kepler) include virtual memory space (which will allow CPUs and GPUs to use the "unified" virtual memory), pre-emption, enhance the ability of GPU to autonomously process the data without the help of CPU and so on. Entry-level chips may not get all the features that Kepler architecture will have to offer."
View at TechPowerUp Main Site
Last edited: