• Welcome to TechPowerUp Forums, Guest! Please check out our forum guidelines for info related to our community.

TSMC Expanding 28 nm Manufacturing Facility

btarunr

Editor & Senior Moderator
Staff member
Joined
Oct 9, 2007
Messages
47,290 (7.53/day)
Location
Hyderabad, India
System Name RBMK-1000
Processor AMD Ryzen 7 5700G
Motherboard ASUS ROG Strix B450-E Gaming
Cooling DeepCool Gammax L240 V2
Memory 2x 8GB G.Skill Sniper X
Video Card(s) Palit GeForce RTX 2080 SUPER GameRock
Storage Western Digital Black NVMe 512GB
Display(s) BenQ 1440p 60 Hz 27-inch
Case Corsair Carbide 100R
Audio Device(s) ASUS SupremeFX S1220A
Power Supply Cooler Master MWE Gold 650W
Mouse ASUS ROG Strix Impact
Keyboard Gamdias Hermes E2
Software Windows 11 Pro
With the advent of highly-complex 28 nm discrete PC graphics processors, and ARM designers lined up with their increasingly powerful SoCs, TSMC is bound to see a pile up of orders for chips built on its newest bulk manufacturing process. In view of this, the "messiah of the fabless" is planning an expansion of its 28 nm manufacturing facility. This expansion is set to occur a little later in 2012. TSMC reportedly is running at full capacity at its 12-inch fabs because of strong demand for 28 nm as well as 40 nm and 65 nm. Due to this, some designers are approaching TSMC's competitors UMC and Samsung for 28 nm bulk manufacturing, according to sources. The expansion will follow a revision of TSMC's capex target for 2012, up from US $6 billion.



View at TechPowerUp Main Site
 

radarblade

New Member
Joined
Feb 8, 2012
Messages
48 (0.01/day)
Location
In the middle of Nowhere
This is a definite need right now considering Nvidia's on the brink of their Kepler launch and Intel with their Ivy CPU's not so far away. Companies are demanding more 28nm chips than TSMC can actually produce I guess at full capacity. It's a win win situation for them. :laugh:
 

btarunr

Editor & Senior Moderator
Staff member
Joined
Oct 9, 2007
Messages
47,290 (7.53/day)
Location
Hyderabad, India
System Name RBMK-1000
Processor AMD Ryzen 7 5700G
Motherboard ASUS ROG Strix B450-E Gaming
Cooling DeepCool Gammax L240 V2
Memory 2x 8GB G.Skill Sniper X
Video Card(s) Palit GeForce RTX 2080 SUPER GameRock
Storage Western Digital Black NVMe 512GB
Display(s) BenQ 1440p 60 Hz 27-inch
Case Corsair Carbide 100R
Audio Device(s) ASUS SupremeFX S1220A
Power Supply Cooler Master MWE Gold 650W
Mouse ASUS ROG Strix Impact
Keyboard Gamdias Hermes E2
Software Windows 11 Pro
This is a definite need right now considering Nvidia's on the brink of their Kepler launch and Intel with their Ivy CPU's not so far away.

Intel doesn't use TSMC for anything. It has its own fabs, which are bigger than TSMC's.

And Ivy Bridge is built on 22 nm, not 28 nm. :)
 
Joined
May 22, 2010
Messages
2,516 (0.47/day)
Location
Canada
System Name m1dg3t | DeathBox | HairPi 3
Processor 3570k @ 4.0 1.15v BIOS | q9550 @ 3.77 1.325v BIOS
Motherboard Asrock z77e iTX | p5q Dlx 2301 BIOS
Cooling Custom Water | D-14 & HR-03gt | Passive HSF
Memory Samsung MV-3V4G3D 4g x 2 @ 1866 1.35v | OcZ RpR 2g x 4 @ 1067 2.2v
Video Card(s) MSi 7950 tf3 @1000 / 1350 | Asus 5870 V2 @ 900 / 1275
Storage Adata sx900 256Gb / WD 2500 HHTZ | WD 1001 FALS x 2
Display(s) BenQ gw2750hm | 46" Sharp Quatron
Case BitFenix Prodigy - m0dd3d | Antec Fusion Remote MAX
Audio Device(s) Onboard Toslink > Yamaha HTR 6290 | Xonar HDAV1.3 > Yamaha DSP z7
Power Supply Ocz mXp700w | Ocz zx850w | Cannakit 5v 2.5a
Mouse Logitech G700s | Logitech G9x - Cable Repaired
Keyboard TT Meka G1 - Black w Cherry Blacks| Logitech G11
Software Win7 Home | Xp sp3 & Vista ultimate | Raspbian
Benchmark Scores Epeen!! Who needs epeen??
Hopefully this doesn't affect their current mfg
 
Joined
Apr 19, 2011
Messages
2,198 (0.44/day)
Location
So. Cal.
Does it seem a little late if now only "planning an expansion"! They're just now figuring out the 28Nm pricing increase doesn't mean diddly if you don't have the production capability to capitalize. It tells me that they've or do have significant production problems that have and will curtail project volumes and looking to quickly augment that. My question of fast can this happen... I know "not fast enough" for anybody or to make any differance in the next 6-8mo.

How bad is TSMC?
 
Top