- Joined
- Oct 9, 2007
- Messages
- 47,233 (7.55/day)
- Location
- Hyderabad, India
System Name | RBMK-1000 |
---|---|
Processor | AMD Ryzen 7 5700G |
Motherboard | ASUS ROG Strix B450-E Gaming |
Cooling | DeepCool Gammax L240 V2 |
Memory | 2x 8GB G.Skill Sniper X |
Video Card(s) | Palit GeForce RTX 2080 SUPER GameRock |
Storage | Western Digital Black NVMe 512GB |
Display(s) | BenQ 1440p 60 Hz 27-inch |
Case | Corsair Carbide 100R |
Audio Device(s) | ASUS SupremeFX S1220A |
Power Supply | Cooler Master MWE Gold 650W |
Mouse | ASUS ROG Strix Impact |
Keyboard | Gamdias Hermes E2 |
Software | Windows 11 Pro |
Although Intel will launch its first 3rd Generation Core processor family, based on the 22 nm "Ivy Bridge" silicon, towards the end of this month, it will not be in a position to launch Core i3 desktop processors until Q3. These include 3.40 GHz Core i3-3240, the 3.00 GHz Core i3-3240T, the 3.30 GHz Core i3-3225, the 3.30 GHz Core i3-3220 (slower IGP) and the 2.80 GHz Core i3-3220T. All these chips pack two cores, four threads (with HyperThreading enabled), and 3 MB of L3 cache.
The standard models have 55W TDP, with the energy-efficient "T" models bearing just 35W rated TDP. Introduction of these chips was originally slated for June, but the delay to Q3 may have been caused due to a variety of factors, such as undigested inventories of current-generation chips or even lack of 22 nm production volumes (with a bulk of them being allocated to mobile chips). Q3 begins in July.
View at TechPowerUp Main Site
The standard models have 55W TDP, with the energy-efficient "T" models bearing just 35W rated TDP. Introduction of these chips was originally slated for June, but the delay to Q3 may have been caused due to a variety of factors, such as undigested inventories of current-generation chips or even lack of 22 nm production volumes (with a bulk of them being allocated to mobile chips). Q3 begins in July.
View at TechPowerUp Main Site