• Welcome to TechPowerUp Forums, Guest! Please check out our forum guidelines for info related to our community.

Possible NVIDIA GM200 Specs Surface

Joined
Mar 28, 2014
Messages
586 (0.15/day)
Processor AMD FX-8320
Motherboard AsRock 970 PRO3 R2.0
Cooling Thermalright Ultra120 eXtreme + 2 LED Green fans
Memory 2 x 4096 MB DDR3-1333 A-Data
Video Card(s) SAPPHIRE 4096M R9 FURY X 4G D5
Storage ST1000VX000 • SV35.6 Series™ 1000 GB 7200 rpm
Display(s) Acer S277HK wmidpp 27" 4K (3840 x 2160) IPS
Case Cooler Master HAF 912 Plus Black + Red Lights
Audio Device(s) Onboard Realtek
Power Supply OCZ ProXStream 1000W
Mouse Genius NetScroll 100X
Keyboard Logitech Wave
Software Windows 7 Ultimate 64-bit
In theory, it would be fairly easy.

If you'd bothered to read what I wrote it would be obvious that what I was pointing out was that 3DC attributed the name Fiji to the 4096 shader part. I might also point out that many other sources do the same including a well known AMD brown-noser who claims intimate knowledge of AMD's business (although you'll have to stump up a fee to breach the paywall ). Have AMD swapped the names around? were they in the right order to begin with? Who knows, although I'd note that the other parts in the hierarchy don't seem affected.

3DC don't release leaks, they gather information and extrapolate from that. Their membership includes a number of industry insiders, coders, architects. Chiphell on the other hand are a conglomeration like any forum based site.

3DC info is old enough and we have new piece of data which changes initial plans.
Maybe initially Fiji had indeed been scheduled for production on 28nm with 4096 shaders, but afterwards it could be forward-ported to a more advanced manufacturing process, 20nm at GloFo.

In theory it would be ok but in practice, to me, releasing anything 28nm (even GM200) is purely a short-vision decision.

The more you delay in time
TheGoodBadWeird said:
The 390x is rumored not to come till summer 2015. Would be a long wait till then with only a low-midtier class card.

the more likely those will use either 20nm or 16nm. :rolleyes:

http://wccftech.com/nvidia-gm200-titan-2-amd-fiji-380x-bermuda-390x-benchmarked/

 
Joined
Sep 7, 2011
Messages
2,785 (0.57/day)
Location
New Zealand
System Name MoneySink
Processor 2600K @ 4.8
Motherboard P8Z77-V
Cooling AC NexXxos XT45 360, RayStorm, D5T+XSPC tank, Tygon R-3603, Bitspower
Memory 16GB Crucial Ballistix DDR3-1600C8
Video Card(s) GTX 780 SLI (EVGA SC ACX + Giga GHz Ed.)
Storage Kingston HyperX SSD (128) OS, WD RE4 (1TB), RE2 (1TB), Cav. Black (2 x 500GB), Red (4TB)
Display(s) Achieva Shimian QH270-IPSMS (2560x1440) S-IPS
Case NZXT Switch 810
Audio Device(s) onboard Realtek yawn edition
Power Supply Seasonic X-1050
Software Win8.1 Pro
Benchmark Scores 3.5 litres of Pale Ale in 18 minutes.
3DC info is old enough and we have new piece of data which changes initial plans.
Maybe initially Fiji had indeed been scheduled for production on 28nm with 4096 shaders, but afterwards it could be forward-ported to a more advanced manufacturing process, 20nm at GloFo.
No doubt the design can be ported to a 20nm based process in future (although it seems unlikely with 16nmFF/14nm-XM not too far off), but I still haven't heard a single logical explanation why AMD would go from building large GPUs on 20nm (and if they are being benchmarked now production started at least a quarter ago) then move to 28nm SHP this year. Seems ass-backwards.

What makes it even more unlikely is that AMD will be unveiling the Carrizo APU with the same GPU architecture using 28nm (very likely at this weeks CES). Wouldn't it make more sense to consolidate APUs and GPUs on the same process when the APUs use the same graphics cores as the discrete GPUs?

In theory it would be ok but in practice, to me, releasing anything 28nm (even GM200) is purely a short-vision decision.
Graphics cards have a short shelf life. You build on the processes suited for the task and readily available.
the more likely those will use either 20nm or 16nm. :rolleyes:
Unless AMD are really late to the party, I think you're setting yourself up for disappointment. The time frame for Fiji (its test and validation boards being sighted on Zauba some months back) almost certainly seems to point to 28nm IMO. Bermuda hasn't been sighted, so if it's a further development for a later launch then a smaller node is a definite possibility.
 
Joined
Apr 30, 2008
Messages
4,901 (0.81/day)
Location
Multidimensional
System Name Boomer Master Race
Processor AMD Ryzen 7 8745H
Motherboard MinisForum 870 Slim Board
Cooling Mini PC Cooling
Memory Crucial 32GB 5600Mhz
Video Card(s) Radeon 780M
Storage Kingston 1TB SSD
Display(s) Sony 4K Bravia X85J 43Inch TV 120Hz
Case MinisForum 870 Slim Case
Audio Device(s) Built In Realtek Digital Audio HD
Power Supply 120w External Power Brick
Mouse Logitech G203 Lightsync
Keyboard Atrix RGB Slim Keyboard
VR HMD ( ◔ ʖ̯ ◔ )
Software Windows 11 Pro 64bit
Benchmark Scores Don't do them anymore.
You miss the days of Seronxadamus predicting AMD's new CPU's performing 60% better than Intels with perfectly linear scaling and everyone in the software design industry magically coding for 32-threads? The news posts have always been hit or miss, this one is just especially silly.

Uum no! o_O Got nothing to do with just AMD & Intel, I'm referring to the way ppl had discussions on this site, ppl actually helped each other without resorting to a fanboyish mindset, and there were rarely any trolls as well. But I'm going back to around 2008 - 2011....
 
Joined
Mar 28, 2014
Messages
586 (0.15/day)
Processor AMD FX-8320
Motherboard AsRock 970 PRO3 R2.0
Cooling Thermalright Ultra120 eXtreme + 2 LED Green fans
Memory 2 x 4096 MB DDR3-1333 A-Data
Video Card(s) SAPPHIRE 4096M R9 FURY X 4G D5
Storage ST1000VX000 • SV35.6 Series™ 1000 GB 7200 rpm
Display(s) Acer S277HK wmidpp 27" 4K (3840 x 2160) IPS
Case Cooler Master HAF 912 Plus Black + Red Lights
Audio Device(s) Onboard Realtek
Power Supply OCZ ProXStream 1000W
Mouse Genius NetScroll 100X
Keyboard Logitech Wave
Software Windows 7 Ultimate 64-bit
why AMD would go from building large GPUs on 20nm

No, because Bermuda won't be so large in the first place.

(and if they are being benchmarked now production started at least a quarter ago)

Not necessarily. You had a benchmarked engineering sample.


I am still not quite sure about this.

Graphics cards have a short shelf life.

Unless AMD are really late to the party, I think you're setting yourself up for disappointment.

No.
No.

My finances would be actually quite relaxed to wait till real 20nm or 16nm products. Short shelf life doesn't equate to short service in consumers' cases.
 
Joined
Sep 7, 2011
Messages
2,785 (0.57/day)
Location
New Zealand
System Name MoneySink
Processor 2600K @ 4.8
Motherboard P8Z77-V
Cooling AC NexXxos XT45 360, RayStorm, D5T+XSPC tank, Tygon R-3603, Bitspower
Memory 16GB Crucial Ballistix DDR3-1600C8
Video Card(s) GTX 780 SLI (EVGA SC ACX + Giga GHz Ed.)
Storage Kingston HyperX SSD (128) OS, WD RE4 (1TB), RE2 (1TB), Cav. Black (2 x 500GB), Red (4TB)
Display(s) Achieva Shimian QH270-IPSMS (2560x1440) S-IPS
Case NZXT Switch 810
Audio Device(s) onboard Realtek yawn edition
Power Supply Seasonic X-1050
Software Win8.1 Pro
Benchmark Scores 3.5 litres of Pale Ale in 18 minutes.
Uum no! o_O Got nothing to do with just AMD & Intel, I'm referring to the way ppl had discussions on this site, ppl actually helped each other without resorting to a fanboyish mindset, and there were rarely any trolls as well. But I'm going back to around 2008 - 2011....
Just for comparison, here's a direct comparison of the same situation ( Nvidia top-tier GPU release rumour) from 2009 - the fanboy accusations started flying inside the first 2 pages.

EDIT:
Not necessarily. You had a benchmarked engineering sample.
(and if they are being benchmarked now production started at least a quarter ago)
Fiji XT boards began shipping two months ago at least

From tape out to finished silicon takes 8-12 weeks ( Tape out > fabrication > die cutting > chip runtime testing > die packaging > board assembly). Eight weeks prior to 7 November makes it four months - a quarter of a year.
 
Last edited:
Joined
Mar 28, 2014
Messages
586 (0.15/day)
Processor AMD FX-8320
Motherboard AsRock 970 PRO3 R2.0
Cooling Thermalright Ultra120 eXtreme + 2 LED Green fans
Memory 2 x 4096 MB DDR3-1333 A-Data
Video Card(s) SAPPHIRE 4096M R9 FURY X 4G D5
Storage ST1000VX000 • SV35.6 Series™ 1000 GB 7200 rpm
Display(s) Acer S277HK wmidpp 27" 4K (3840 x 2160) IPS
Case Cooler Master HAF 912 Plus Black + Red Lights
Audio Device(s) Onboard Realtek
Power Supply OCZ ProXStream 1000W
Mouse Genius NetScroll 100X
Keyboard Logitech Wave
Software Windows 7 Ultimate 64-bit

The problem with your theory is that if Fiji has been shipping for so long time, there is still no physical evidence or proof, or even a slight hint about coming launches.

So, when will it be released? :D
 
Last edited:
Top