• Welcome to TechPowerUp Forums, Guest! Please check out our forum guidelines for info related to our community.

Intel's Ponte Vecchio HPC GPU Successor Rialto Bridge Gets the Axe

Joined
May 30, 2015
Messages
1,942 (0.56/day)
Location
Seattle, WA
Late on Friday in a newsroom posting by Intel's Interim GM Jeff McVeigh a roadmap uplift was quietly revealed. Rialto Bridge, the process improved version of Ponte Vecchio currently shipping under the Max Series GPU branding, has been pulled from the roadmap in favor of doubling down on the future design code-named Falcon Shores. Rialto Bridge was first announced last May at SC22 as the direct successor to Ponte Vecchio, and was set to begin sampling later this year. In the same post Intel also cancelled Lancaster Sound, their Visual Cloud GPU meant to replace the Arctic Sound Flex series of GPUs based on similar Xe cores to Arc Alchemist. In its stead the follow-up architecture Melville Sound will receive focused development efforts.

Falcon Shores is described as a new foundational chiplet architecture that will integrate more diverse compute tiles, creating what Intel originally dubbed the XPU. This next architectural step would combine what Intel is already doing with products such as Sapphire Rapids and Ponte Vecchio into one CPU+GPU package, and would offer even further flexibility to add other kinds of accelerators. With this roadmap update there is some uncertainty as to whether the XPU designation will make the transition as it is notably absent in the letter. It is clear though that Falcon Shores will directly replace Ponte Vecchio as the next HPC GPU, with or without CPU tiles included.



With these changes to the roadmap Intel intends to restructure their data center GPU business to a two-year cadence. Stating that:
"This matches customer expectations on new product introductions and allows time to develop their ecosystems."

View at TechPowerUp Main Site | Source
 
Joined
Aug 21, 2013
Messages
1,936 (0.47/day)
Big surprise. At this point any Intel product is just a placeholder that may or may not be released at some point but rarely on time.
 
Joined
Aug 30, 2006
Messages
7,223 (1.08/day)
System Name ICE-QUAD // ICE-CRUNCH
Processor Q6600 // 2x Xeon 5472
Memory 2GB DDR // 8GB FB-DIMM
Video Card(s) HD3850-AGP // FireGL 3400
Display(s) 2 x Samsung 204Ts = 3200x1200
Audio Device(s) Audigy 2
Software Windows Server 2003 R2 as a Workstation now migrated to W10 with regrets.
The is a beautiful example of Product Managers running ahead of themselves. In their attempt to manage the Product Lifecycle of their product portfolio, they issue roadmaps to test the market interest even before the engineers and project managers have working prototypes. And on this occasion, the upper management said no, or the R&D couldnt get anything working that would have performance exciting enough to create a market niche.
 
Joined
Dec 12, 2016
Messages
1,948 (0.66/day)
Makes sense. PV was so late that it bunches up too many planned releases. Cancel and spread out is probably the best way to go.
 
Joined
Apr 16, 2010
Messages
3,609 (0.67/day)
Location
Portugal
System Name LenovoⓇ ThinkPad™ T430
Processor IntelⓇ Core™ i5-3210M processor (2 cores, 2.50GHz, 3MB cache), Intel Turbo Boost™ 2.0 (3.10GHz), HT™
Motherboard Lenovo 2344 (Mobile Intel QM77 Express Chipset)
Cooling Single-pipe heatsink + Delta fan
Memory 2x 8GB KingstonⓇ HyperX™ Impact 2133MHz DDR3L SO-DIMM
Video Card(s) Intel HD Graphics™ 4000 (GPU clk: 1100MHz, vRAM clk: 1066MHz)
Storage SamsungⓇ 860 EVO mSATA (250GB) + 850 EVO (500GB) SATA
Display(s) 14.0" (355mm) HD (1366x768) color, anti-glare, LED backlight, 200 nits, 16:9 aspect ratio, 300:1 co
Case ThinkPad Roll Cage (one-piece magnesium frame)
Audio Device(s) HD Audio, RealtekⓇ ALC3202 codec, DolbyⓇ Advanced Audio™ v2 / stereo speakers, 1W x 2
Power Supply ThinkPad 65W AC Adapter + ThinkPad Battery 70++ (9-cell)
Mouse TrackPointⓇ pointing device + UltraNav™, wide touchpad below keyboard + ThinkLight™
Keyboard 6-row, 84-key, ThinkVantage button, spill-resistant, multimedia Fn keys, LED backlight (PT Layout)
Software MicrosoftⓇ WindowsⓇ 10 x86-64 (22H2)
I swear that "Rialto Bridge" and Intel in the same sentence confused me a bit...
1678295330856.png
 
Joined
Jan 14, 2019
Messages
12,566 (5.80/day)
Location
Midlands, UK
System Name Nebulon B
Processor AMD Ryzen 7 7800X3D
Motherboard MSi PRO B650M-A WiFi
Cooling be quiet! Dark Rock 4
Memory 2x 24 GB Corsair Vengeance DDR5-4800
Video Card(s) AMD Radeon RX 6750 XT 12 GB
Storage 2 TB Corsair MP600 GS, 2 TB Corsair MP600 R2
Display(s) Dell S3422DWG, 7" Waveshare touchscreen
Case Kolink Citadel Mesh black
Audio Device(s) Logitech Z333 2.1 speakers, AKG Y50 headphones
Power Supply Seasonic Prime GX-750
Mouse Logitech MX Master 2S
Keyboard Logitech G413 SE
Software Bazzite (Fedora Linux) KDE
So basically, they figured it's better to release something good whenever it's ready instead of incremental upgrades on a regular basis. I wonder why the rest of the industry hasn't come to this realisation yet.
 
Joined
May 3, 2018
Messages
2,881 (1.19/day)
Next we'll hear Meteor Lake cancelled as they decide to go straight from Raptor lake+ to Arrow Lake
 
Top