• Welcome to TechPowerUp Forums, Guest! Please check out our forum guidelines for info related to our community.

SemiAnalysis Spotlights Sluggish US Chip Fab Construction

T0@st

News Editor
Joined
Mar 7, 2023
Messages
2,077 (3.19/day)
Location
South East, UK
Dylan Patel, of SemiAnalysis, has highlighted worrying industry trends from an October 2021 published report—the Center for Security and Emerging Technology (CSET) document explored and "(outlined) infrastructure investments and regulatory reforms that could make the United States a more attractive place to build new chipmaking capacity and ensure continued U.S. access to key inputs for semiconductor manufacturing." Citing CSET/World Fab Forecast findings, Patel expressed his dissatisfaction with the apparent lack of progress in the region: "The United States is the slowest relevant country in the world to build a fab thanks to NIMBY assholes and the garbage regulatory/permitting system." The SemiAnalysis staffer likely believes that unsuitable conditions remain in place, and continue to hinder any forward momentum—for greenfield fabrications projects, at least.

The CSET 2021 report posited that the proposed $52 billion CHIPS Act fund would not solve all USA chip industry problems—throwing a large sum of money into the pot is not always a surefire solution: "The United States' ability to expeditiously construct fabs has declined at the same time as the total number of fab projects in the United States has declined. Some of this is due to changes in the global semiconductor value chain, which has concentrated resources in Asia as foundries have risen in prominence, and countries like Taiwan, South Korea, and China have established significant market share in the industry from 1990 to 2020. However, during this same 30-year period, the time required to build a new fab in the United States increased 38 percent, rising from an average of 665 days (1.8 years) during the 1990 to 2000 time period to 918 days (2.5 years) during the 2010-2020 time period (Figure 2). At the same time, the total number of new fab projects in the United States was halved, decreasing from 55 greenfield fab projects in the 1990-2000 time period to 22 greenfield fab projects between 2010 and 2020." Intel's work-in-progress Ohio fabrication site has suffered numerous setbacks (including delayed CHIPS Act payments)—the latest news articles suggest that an opening ceremony could occur in late 2026 or early 2027. Reportedly, TSMC's Arizona facility is a frequently runs into bureaucratic and logistical headaches—putting pressure on company leadership at their Hsinchu (Taiwan) headquarters.



View at TechPowerUp Main Site | Source
 
Joined
Sep 6, 2013
Messages
3,389 (0.82/day)
Location
Athens, Greece
System Name 3 desktop systems: Gaming / Internet / HTPC
Processor Ryzen 5 7600 / Ryzen 5 4600G / Ryzen 5 5500
Motherboard X670E Gaming Plus WiFi / MSI X470 Gaming Plus Max (1) / MSI X470 Gaming Plus Max (2)
Cooling Aigo ICE 400SE / Segotep T4 / Νoctua U12S
Memory Kingston FURY Beast 32GB DDR5 6000 / 16GB JUHOR / 32GB G.Skill RIPJAWS 3600 + Aegis 3200
Video Card(s) ASRock RX 6600 + GT 710 (PhysX) / Vega 7 integrated / Radeon RX 580
Storage NVMes, ONLY NVMes / NVMes, SATA Storage / NVMe, SATA, external storage
Display(s) Philips 43PUS8857/12 UHD TV (120Hz, HDR, FreeSync Premium) / 19'' HP monitor + BlitzWolf BW-V5
Case Sharkoon Rebel 12 / CoolerMaster Elite 361 / Xigmatek Midguard
Audio Device(s) onboard
Power Supply Chieftec 850W / Silver Power 400W / Sharkoon 650W
Mouse CoolerMaster Devastator III Plus / CoolerMaster Devastator / Logitech
Keyboard CoolerMaster Devastator III Plus / CoolerMaster Devastator / Logitech
Software Windows 10 / Windows 10&Windows 11 / Windows 10
thanks to NIMBY assholes and the garbage regulatory/permitting system
WOW!!!!!......

The whole article is like reading about Greece. I guess bureaucracy is a disease in most countries.
 
Joined
Jan 25, 2020
Messages
2,227 (1.24/day)
System Name GrandadsBadAss
Processor I7 13700k w/ HEATKILLER IV PRO Copper Nickel
Motherboard MSI Z790 Tomahawk Wifi
Cooling BarrowCH Boxfish 200mm-HWLabs SR2 420/GTS 360-BP Dual D5 MOD TOP- 2x Koolance PMP 450S
Memory 2x16gb G.SKILL Trident Z5 Neo RGB 6400
Video Card(s) Asrock 6800xt PG D w/ Byski A-AR6900XT-X
Storage WD SN850x 1TB NVME M.2/Samsung 980 Pro 1TB NVMe M.2
Display(s) Acer XG270HU
Case Phanteks Enthoo Pro 2 Server Edition w/3 Noctua NF-A14 2000 IP67/4 be quiet! LIGHT WINGS LX 120mm
Audio Device(s) Logitech z623 <---THE SUCK
Power Supply FSP Hydro Ti PRO 1000w
Mouse Logitech G502
Keyboard Roccat Vulcan Aimo
Software Win 10/11pro
Everybody has a flag to defend. Most don't make sense to anyone but the ones waving them.
 
Joined
Oct 18, 2013
Messages
6,250 (1.53/day)
Location
Over here, right where you least expect me to be !
System Name The Little One
Processor i5-11320H @4.4GHZ
Motherboard AZW SEI
Cooling Fan w/heat pipes + side & rear vents
Memory 64GB Crucial DDR4-3200 (2x 32GB)
Video Card(s) Iris XE
Storage WD Black SN850X 4TB m.2, Seagate 2TB SSD + SN850 4TB x2 in an external enclosure
Display(s) 2x Samsung 43" & 2x 32"
Case Practically identical to a mac mini, just purrtier in slate blue, & with 3x usb ports on the front !
Audio Device(s) Yamaha ATS-1060 Bluetooth Soundbar & Subwoofer
Power Supply 65w brick
Mouse Logitech MX Master 2
Keyboard Logitech G613 mechanical wireless
Software Windows 10 pro 64 bit, with all the unnecessary background shitzu turned OFF !
Benchmark Scores PDQ
I guess bureaucracy is a disease in most countries
I certainly is here in the good ole US of A....

It infects, complicates, and most definitely clusterflukes everything everywhere all the time, non-stop 24/7/365...

But I would be remiss if I didn't say it's our own fault, since we collectively & continually re-elect the same out of touch, out of date, closed/narrow-minded, greed-mongering shit-for-brains politicians to represent us at every level of gov't....
 
Joined
Oct 28, 2023
Messages
107 (0.26/day)
Try building something here in Croatia. Even when people decide to invest in something, they have to count in bribe on top of all the permits. It is not uncommon for local human garbage to let companies build everything and then make up some last minute paper just to blackmail a bribe out of investors, after everything was already built. Jysk is the latest victim in my home town.
 
Joined
Jan 11, 2022
Messages
910 (0.85/day)
Te not that foundries have become easier to build and the requirements have become lower since the 350nm days back in 1994
 
Joined
May 29, 2012
Messages
535 (0.12/day)
System Name CUBE_NXT
Processor i9 12900K @ 5.0Ghz all P-cores with E-cores enabled
Motherboard Gigabyte Z690 Aorus Master
Cooling EK AIO Elite Cooler w/ 3 Phanteks T30 fans
Memory 64GB DDR5 @ 5600Mhz
Video Card(s) EVGA 3090Ti Ultra Hybrid Gaming w/ 3 Phanteks T30 fans
Storage 1 x SK Hynix P41 Platinum 1TB, 1 x 2TB, 1 x WD_BLACK SN850 2TB, 1 x WD_RED SN700 4TB
Display(s) Alienware AW3418DW
Case Lian-Li O11 Dynamic Evo w/ 3 Phanteks T30 fans
Power Supply Seasonic PRIME 1000W Titanium
Software Windows 11 Pro 64-bit
It would probably go easier if a bunch of companies didn't choose to build their incredibly water intensive fab facilities in the middle of a fucking desert just because they got good tax bribes err I mean "incentives" to build there.
 
Top