- Joined
- Aug 19, 2017
- Messages
- 2,671 (0.99/day)
According to Benchlife.info insiders, NVIDIA is supposedly in the phase of testing designs with various Total Graphics Power (TGP), running from 250 Watts to 600 Watts, for its upcoming GeForce RTX 50 series Blackwell graphics cards. The company is testing designs ranging from 250 W aimed at mainstream users and a more powerful 600 W configuration tailored for enthusiast-level performance. The 250 W cooling system is expected to prioritize compactness and power efficiency, making it an appealing choice for gamers seeking a balance between capability and energy conservation. This design could prove particularly attractive for those building small form-factor rigs or AIBs looking to offer smaller cooler sizes. On the other end of the spectrum, the 600 W cooling solution is the highest TGP of the stack, which is possibly only made for testing purposes. Other SKUs with different power configurations come in between.
We witnessed NVIDIA testing a 900-watt version of the Ada Lovelace AD102 GPU SKU, which never saw the light of day, so we should take this testing phase with a grain of salt. Often, the engineering silicon is the first batch made for the enablement of software and firmware, while the final silicon is much more efficient and more optimized to use less power and align with regular TGP structures. The current highest-end SKU, the GeForce RTX 4090, uses 450-watt TGP. So, take this phase with some reservations as we wait for more information to come out.
View at TechPowerUp Main Site | Source
We witnessed NVIDIA testing a 900-watt version of the Ada Lovelace AD102 GPU SKU, which never saw the light of day, so we should take this testing phase with a grain of salt. Often, the engineering silicon is the first batch made for the enablement of software and firmware, while the final silicon is much more efficient and more optimized to use less power and align with regular TGP structures. The current highest-end SKU, the GeForce RTX 4090, uses 450-watt TGP. So, take this phase with some reservations as we wait for more information to come out.
View at TechPowerUp Main Site | Source