• Welcome to TechPowerUp Forums, Guest! Please check out our forum guidelines for info related to our community.

Intel 20A Node Cancelled for Foundry Customers, "Arrow Lake" Mainly Manufactured Externally

AleksandarK

News Editor
Staff member
Joined
Aug 19, 2017
Messages
2,582 (0.97/day)
Intel has announced the cancellation of its 20A node for Foundry customers, as well as shifting majority of Arrow Lake production to external foundries. The tech giant will instead focus its resources on the more advanced 18A node while relying on external partners for Arrow Lake production, likely tapping TSMC or Samsung for their 2 nm nodes. The decision follows Intel's successful release of the 18A Process Design Kit (PDK) 1.0 in July, which garnered positive feedback from the ecosystem, according to the company. Intel reports that the 18A node is already operational, booting operating systems and yielding well, keeping the company on track for a 2025 launch. This early success has enabled Intel to reallocate engineering resources from 20A to 18A sooner than anticipated. As a result, the "Arrow Lake processor family will be built primarily using external partners and packaged by Intel Foundry".

The 20A node, while now cancelled for Arrow Lake, has played a crucial role in Intel's journey towards 18A. It served as a testbed for new techniques, materials, and transistor architectures essential for advancing Moore's Law. The 20A node successfully integrated both RibbonFET gate-all-around transistor architecture and PowerVia backside power delivery for the first time, providing valuable insights that directly informed the development of 18A. Intel's decision to focus on 18A is also driven by economic factors. With the current 18A defect density already at D0 <0.40, the company sees an opportunity to optimize its engineering investments by transitioning now. However, challenges remain, as evidenced by recent reports of Broadcom's disappointment in the 18A node. Despite these hurdles, Intel remains optimistic about the future of its foundry services and the potential of its advanced manufacturing processes. The coming months will be crucial as the company works to demonstrate the capabilities of its 18A node and secure more partners for its foundry business.



View at TechPowerUp Main Site | Source
 
Joined
Aug 12, 2019
Messages
2,178 (1.13/day)
Location
LV-426
System Name Custom
Processor i9 9900k
Motherboard Gigabyte Z390 arous master
Cooling corsair h150i
Memory 4x8 3200mhz corsair
Video Card(s) Galax RTX 3090 EX Gamer White OC
Storage 500gb Samsung 970 Evo PLus
Display(s) MSi MAG341CQ
Case Lian Li Pc-011 Dynamic
Audio Device(s) Arctis Pro Wireless
Power Supply 850w Seasonic Focus Platinum
Mouse Logitech G403
Keyboard Logitech G110
i think that is a wise decision... the 18A nodes will have better power efficiency i hope....
 
Joined
Feb 3, 2017
Messages
3,750 (1.32/day)
Processor Ryzen 7800X3D
Motherboard ROG STRIX B650E-F GAMING WIFI
Memory 2x16GB G.Skill Flare X5 DDR5-6000 CL36 (F5-6000J3636F16GX2-FX5)
Video Card(s) INNO3D GeForce RTX™ 4070 Ti SUPER TWIN X2
Storage 2TB Samsung 980 PRO, 4TB WD Black SN850X
Display(s) 42" LG C2 OLED, 27" ASUS PG279Q
Case Thermaltake Core P5
Power Supply Fractal Design Ion+ Platinum 760W
Mouse Corsair Dark Core RGB Pro SE
Keyboard Corsair K100 RGB
VR HMD HTC Vive Cosmos
Interesting. What the hell is Arrow Lake manufactured on then? TSMC N3? N4? :D
Depends on what they mean "primarily" of course. Until now they have said cores chiplet is Intel and 20A.
 
Joined
May 8, 2016
Messages
1,909 (0.61/day)
System Name BOX
Processor Core i7 6950X @ 4,26GHz (1,28V)
Motherboard X99 SOC Champion (BIOS F23c + bifurcation mod)
Cooling Thermalright Venomous-X + 2x Delta 38mm PWM (Push-Pull)
Memory Patriot Viper Steel 4000MHz CL16 4x8GB (@3240MHz CL12.12.12.24 CR2T @ 1,48V)
Video Card(s) Titan V (~1650MHz @ 0.77V, HBM2 1GHz, Forced P2 state [OFF])
Storage WD SN850X 2TB + Samsung EVO 2TB (SATA) + Seagate Exos X20 20TB (4Kn mode)
Display(s) LG 27GP950-B
Case Fractal Design Meshify 2 XL
Audio Device(s) Motu M4 (audio interface) + ATH-A900Z + Behringer C-1
Power Supply Seasonic X-760 (760W)
Mouse Logitech RX-250
Keyboard HP KB-9970
Software Windows 10 Pro x64
i think that is a wise decision... the 18A nodes will have better power efficiency i hope....
"Better power efficiency" doesn't mean newer node CPUs won't be 250W+ TDP reactors. It's up to Intel to make a spec for CPUs after all.
Newer node will be better, but if things go as they are now - you will just see a bit higher performance with the same "maxed out" voltages and power usage.
Why ?
Because it sells (and most don't care about power usage or to run CPUs in their perf/power sweet spot).
 
Last edited:
Joined
Jan 11, 2022
Messages
870 (0.83/day)
Wel it was rumoured to happenand I didn’t believe it.
serious blow In my confidence they would be ok, they are worse than Samsung at the moment
 
Joined
Sep 6, 2013
Messages
3,329 (0.81/day)
Location
Athens, Greece
System Name 3 desktop systems: Gaming / Internet / HTPC
Processor Ryzen 5 5500 / Ryzen 5 4600G / FX 6300 (12 years latter got to see how bad Bulldozer is)
Motherboard MSI X470 Gaming Plus Max (1) / MSI X470 Gaming Plus Max (2) / Gigabyte GA-990XA-UD3
Cooling Νoctua U12S / Segotep T4 / Snowman M-T6
Memory 32GB - 16GB G.Skill RIPJAWS 3600+16GB G.Skill Aegis 3200 / 16GB JUHOR / 16GB Kingston 2400MHz (DDR3)
Video Card(s) ASRock RX 6600 + GT 710 (PhysX)/ Vega 7 integrated / Radeon RX 580
Storage NVMes, ONLY NVMes/ NVMes, SATA Storage / NVMe boot(Clover), SATA storage
Display(s) Philips 43PUS8857/12 UHD TV (120Hz, HDR, FreeSync Premium) ---- 19'' HP monitor + BlitzWolf BW-V5
Case Sharkoon Rebel 12 / CoolerMaster Elite 361 / Xigmatek Midguard
Audio Device(s) onboard
Power Supply Chieftec 850W / Silver Power 400W / Sharkoon 650W
Mouse CoolerMaster Devastator III Plus / CoolerMaster Devastator / Logitech
Keyboard CoolerMaster Devastator III Plus / CoolerMaster Devastator / Logitech
Software Windows 10 / Windows 10&Windows 11 / Windows 10
It wasn't making much sense to be developing two almost identical nodes at the same time, expect if Intel wasn't sure that 18A will succeed and had 20A as a back up plan. Probably 18A is doing well enough for them to not need to keep throwing money at 20A node.
That's the good scenario.

The bad scenario takes in consideration the fact, Broadcom not being enthusiastic about Intel's manufacturing in it's current phase and also seeing Intel "relying on external partners for Arrow Lake production" instead of moving it to it's own 18A manufacturing node. That probably means that Intel, not just Broadcom, is still unsure about 18A quality or scheduling. Until Intel comes out with a mass producing product at 18A, their manufacturing will continue being a huge question mark, years behind TSMC and even Samsung.
 

FiRe

New Member
Joined
Dec 23, 2021
Messages
24 (0.02/day)
this smells like "20A has oxidation issues too, we're outsourcing this and then working on/fixing 18A"
 
Joined
Feb 3, 2017
Messages
3,750 (1.32/day)
Processor Ryzen 7800X3D
Motherboard ROG STRIX B650E-F GAMING WIFI
Memory 2x16GB G.Skill Flare X5 DDR5-6000 CL36 (F5-6000J3636F16GX2-FX5)
Video Card(s) INNO3D GeForce RTX™ 4070 Ti SUPER TWIN X2
Storage 2TB Samsung 980 PRO, 4TB WD Black SN850X
Display(s) 42" LG C2 OLED, 27" ASUS PG279Q
Case Thermaltake Core P5
Power Supply Fractal Design Ion+ Platinum 760W
Mouse Corsair Dark Core RGB Pro SE
Keyboard Corsair K100 RGB
VR HMD HTC Vive Cosmos
this smells like "20A has oxidation issues too, we're outsourcing this and then working on/fixing 18A"
Why oxidation issues? This would not make sense. Some issues sure, probably resulting in yields issues. It takes time to resolve issues and 18A being incoming - and apparently on track - it is more beneficial to focus on getting that out sooner.
 
Joined
Dec 1, 2020
Messages
460 (0.32/day)
Processor Ryzen 5 7600X
Motherboard ASRock B650M PG Riptide
Cooling Noctua NH-D15
Memory DDR5 6000Mhz CL28 32GB
Video Card(s) Nvidia Geforce RTX 3070 Palit GamingPro OC
Storage Corsair MP600 Force Series Gen.4 1TB
At this point they can't make 5 nodes in 4 years even with just adding "+" every year, because they don't have one working node to begin with

It wasn't making much sense to be developing two almost identical nodes at the same time, expect if Intel wasn't sure that 18A will succeed and had 20A as a back up plan. Probably 18A is doing well enough for them to not need to keep throwing money at 20A node.
That's the good scenario.
They replace the "+" with new name and now they have one "new" node every year, well, this was the initial plan...
 
Joined
Sep 17, 2014
Messages
22,438 (6.03/day)
Location
The Washing Machine
Processor 7800X3D
Motherboard MSI MAG Mortar b650m wifi
Cooling Thermalright Peerless Assassin
Memory 32GB Corsair Vengeance 30CL6000
Video Card(s) ASRock RX7900XT Phantom Gaming
Storage Lexar NM790 4TB + Samsung 850 EVO 1TB + Samsung 980 1TB + Crucial BX100 250GB
Display(s) Gigabyte G34QWC (3440x1440)
Case Lian Li A3 mATX White
Audio Device(s) Harman Kardon AVR137 + 2.1
Power Supply EVGA Supernova G2 750W
Mouse Steelseries Aerox 5
Keyboard Lenovo Thinkpad Trackpoint II
Software W11 IoT Enterprise LTSC
Benchmark Scores Over 9000
It wasn't making much sense to be developing two almost identical nodes at the same time, expect if Intel wasn't sure that 18A will succeed and had 20A as a back up plan. Probably 18A is doing well enough for them to not need to keep throwing money at 20A node.
That's the good scenario.

The bad scenario takes in consideration the fact, Broadcom not being enthusiastic about Intel's manufacturing in it's current phase and also seeing Intel "relying on external partners for Arrow Lake production" instead of moving it to it's own 18A manufacturing node. That probably means that Intel, not just Broadcom, is still unsure about 18A quality or scheduling. Until Intel comes out with a mass producing product at 18A, their manufacturing will continue being a huge question mark, years behind TSMC and even Samsung.
Yeah.
I'm sure there are some differences in perspective from different partners in the food chain here.

Interesting :) Then again the writing was on the wall, when Intel roadmaps something, its really just an educated guess that everyone knows they won't deliver on.
 
Joined
Feb 15, 2019
Messages
1,658 (0.79/day)
System Name Personal Gaming Rig
Processor Ryzen 7800X3D
Motherboard MSI X670E Carbon
Cooling MO-RA 3 420
Memory 32GB 6000MHz
Video Card(s) RTX 4090 ICHILL FROSTBITE ULTRA
Storage 4x 2TB Nvme
Display(s) Samsung G8 OLED
Case Silverstone FT04
The winner is.......

Gg Tsmc GIF
 
Joined
Dec 25, 2020
Messages
6,722 (4.70/day)
Location
São Paulo, Brazil
System Name "Icy Resurrection"
Processor 13th Gen Intel Core i9-13900KS Special Edition
Motherboard ASUS ROG MAXIMUS Z790 APEX ENCORE
Cooling Noctua NH-D15S upgraded with 2x NF-F12 iPPC-3000 fans and Honeywell PTM7950 TIM
Memory 32 GB G.SKILL Trident Z5 RGB F5-6800J3445G16GX2-TZ5RK @ 7600 MT/s 36-44-44-52-96 1.4V
Video Card(s) ASUS ROG Strix GeForce RTX™ 4080 16GB GDDR6X White OC Edition
Storage 500 GB WD Black SN750 SE NVMe SSD + 4 TB WD Red Plus WD40EFPX HDD
Display(s) 55-inch LG G3 OLED
Case Pichau Mancer CV500 White Edition
Power Supply EVGA 1300 G2 1.3kW 80+ Gold
Mouse Microsoft Classic Intellimouse
Keyboard Generic PS/2
Software Windows 11 IoT Enterprise LTSC 24H2
Benchmark Scores I pulled a Qiqi~
this smells like "20A has oxidation issues too, we're outsourcing this and then working on/fixing 18A"

No. Fab contamination slip ups occur every now and then, and Intel is not alone here. TSMC had to trash entire production batches due to contaminants in the past - VERY expensive ordeals. Realistically speaking the amount of production unit samples affected by the via oxidation issue should be relatively insignificant and not worthy of consideration, if you purchase a 12th gen Alder Lake chip or any Raptor Lake chip marketed as "14th gen" you're immune, and 99%+ of the original "13th gen" branded Raptor Lake runs should be OK with this as well. At this point in time it is extremely unlikely you will come across such a processor unless it's been warehoused for years and honestly, by just getting a 14900K instead of a 13900K it's a sure fire way to avoid the problem altogether, even if the risk is absolutely minimal.

The fact of the matter remains that no processor that was potentially affected should have ever shipped to a customer, even, if not particularly considering that Intel was aware that they were functional and could "potentially" become a problem down the line. In my opinion, the company should've relabeled all known potentially affected samples as "Intel Confidential" qualification samples with the ES bit set and handed that batch out to just about anyone in the tech field in an unusually generous grant program, really, just give them out like candy instead, at least they could make the disaster into a ton of good will with the community at large, waive any liability and avoid a lot of heat and negative press. Even if most ended up on Aliexpress down the road, it wouldn't have been as bad of a headache to deal with, since it'd all be "under the rug" and "on the down low", plus if anyone said anything they could wash their hands claiming they were ES chips not intended to be marketed or sold to end users and "any issues never affected production units, <insert boilerplate standard statement about ES chips>" yada yada.

You have to purchase a late-2022 early production run chip manufactured at a very specific plant where the problem occurred at the time to be affected by it, early 2023 chips should already be immune. My i9-13900KS is mid-2023 production unit and it's been stable throughout this entire ordeal, although I have run it with a minor undervolt from day one.
 
Joined
Jul 17, 2011
Messages
85 (0.02/day)
System Name Custom build, AMD/ATi powered.
Processor AMD FX™ 8350 [8x4.6 GHz]
Motherboard AsRock 970 Extreme3 R2.0
Cooling be quiet! Dark Rock Advanced C1
Memory Crucial, Ballistix Tactical, 16 GByte, 1866, CL9
Video Card(s) AMD Radeon HD 7850 Black Edition, 2 GByte GDDR5
Storage 250/500/1500/2000 GByte, SSD: 60 GByte
Display(s) Samsung SyncMaster 950p
Case CoolerMaster HAF 912 Pro
Audio Device(s) 7.1 Digital High Definition Surround
Power Supply be quiet! Straight Power E9 CM 580W
Software Windows 7 Ultimate x64, SP 1
this smells like "20A has oxidation issues too, we're outsourcing this and then working on/fixing 18A"
More like being code for “We pretend that the market buys our lame excuses of scrapping Intel 20Å over never-ending yield-issues in favour of Intel 18Å and Arrow Lake now coming fully from TSMC (like we internally had already planned since the beginning, despite deliberately claming publicly it's a internal Intel 20Å-product), and with that hope that it may buy us some time, before we have to acknowledge the inevitable split anyway”.

They never planned Arrow Lake for being on their own internal Intel 20Å (at least not internally and in secret), but it was already designed to be exclusively TSMC-sourced.

No. Fab contamination slip ups occur every now and then, and Intel is not alone here. TSMC had to trash entire production batches due to contaminants in the past - VERY expensive ordeals.
Except that the very difference in regards to Intel here is, on others like Samsung and TSMC, it's rather imminently communicated quickly, publicly and fully transparently, instead of being sit out and kept shut about for two years straight …

Realistically speaking the amount of production unit samples affected by the via oxidation issue should be relatively insignificant and not worthy of consideration, if you purchase a 12th gen Alder Lake chip or any Raptor Lake chip marketed as "14th gen" you're immune, and 99%+ of the original "13th gen" branded Raptor Lake runs should be OK with this as well. At this point in time it is extremely unlikely you will come across such a processor unless it's been warehoused for years and honestly, by just getting a 14900K instead of a 13900K it's a sure fire way to avoid the problem altogether, even if the risk is absolutely minimal.
Right … And the via-oxidation-issues are proven to totally not help increasing the impact of the other voltage-related disasters and speed up electro-migration.

The fact of the matter remains that no processor that was potentially affected should have ever shipped to a customer, even, if not particularly considering that Intel was aware that they were functional and could "potentially" become a problem down the line.
At least we can agree on that, chap! Fair enough.
In my opinion, the company should've relabeled all known potentially affected samples as "Intel Confidential" qualification samples with the ES bit set and handed that batch out to just about anyone in the tech field in an unusually generous grant program, really, just give them out like candy instead, at least they could make the disaster into a ton of good will with the community at large, waive any liability and avoid a lot of heat and negative press. Even if most ended up on Aliexpress down the road, it wouldn't have been as bad of a headache to deal with, since it'd all be "under the rug" and "on the down low", plus if anyone said anything they could wash their hands claiming they were ES chips not intended to be marketed or sold to end users and "any issues never affected production units, <insert boilerplate standard statement about ES chips>" yada yada.
That would've required to have someone with a brain over there in the first place, to engage in such clever actions. You do know that we're talking about Intel here after all, right?

Intel … a degrading shop already way over the hill (after being the king of it in previous times for way too long), which apparently loves to constantly shoot themself in the foot and immediately after, trigger-happily looks down the barrel on purpose again, for finding out how the previous blow-up and fall-out afterwards could happen.
 
Last edited:
Joined
Dec 25, 2020
Messages
6,722 (4.70/day)
Location
São Paulo, Brazil
System Name "Icy Resurrection"
Processor 13th Gen Intel Core i9-13900KS Special Edition
Motherboard ASUS ROG MAXIMUS Z790 APEX ENCORE
Cooling Noctua NH-D15S upgraded with 2x NF-F12 iPPC-3000 fans and Honeywell PTM7950 TIM
Memory 32 GB G.SKILL Trident Z5 RGB F5-6800J3445G16GX2-TZ5RK @ 7600 MT/s 36-44-44-52-96 1.4V
Video Card(s) ASUS ROG Strix GeForce RTX™ 4080 16GB GDDR6X White OC Edition
Storage 500 GB WD Black SN750 SE NVMe SSD + 4 TB WD Red Plus WD40EFPX HDD
Display(s) 55-inch LG G3 OLED
Case Pichau Mancer CV500 White Edition
Power Supply EVGA 1300 G2 1.3kW 80+ Gold
Mouse Microsoft Classic Intellimouse
Keyboard Generic PS/2
Software Windows 11 IoT Enterprise LTSC 24H2
Benchmark Scores I pulled a Qiqi~
More like being code for “We pretend that the market buys our lame excuses of scrapping Intel 20Å over never-ending yield-issues in favour of Intel 18Å and Arrow Lake now coming fully from TSMC (like we internally had already planned since the beginning, despite deliberately claming publicly it's a internal Intel 20Å-product), and with that hope that it may buy us some time, before we have to acknowledge the inevitable split anyway”.

They never planned Arrow Lake for being on their own internal Intel 20Å (at least not internally and in secret), but it was already designed to be exclusively TSMC-sourced.


Except that the very difference in regards to Intel here is, on others like Samsung and TSMC, it's rather imminently communicated quickly, publicly and fully transparently, instead of being sit out and kept shut about for two years straight …


Right … And the via-oxidation-issues are proven to totally not help increasing the impact of the other voltage-related disasters and speed up electro-migration.


At least we can agree on that, chap! Fair enough.

That would've required to have someone with a brain over there in the first place, to engage in such clever actions. You do know that we're talking about Intel here after all, right?

Intel … a degrading shop already way over the hill (after being the king of it in previous times for way too long), which apparently loves to constantly shoot themself in the foot and immediately after, trigger-happily looks down the barrel on purpose again, for finding out how the previous blow-up and fall-out afterwards could happen.

We're pretty much on the same page :)
 
Joined
Sep 1, 2020
Messages
2,344 (1.52/day)
Location
Bulgaria
Lithographic nodes, have reached a size beyond which reduction will primarily lead to an increase in manufacturing defects. The right way is to stop the race to scale down and work on architectural improvements to the compute lines. Gateway width, more gateways, more and smart gates, more efficient predictors. Bigger and smart caches.
 
Joined
Apr 12, 2013
Messages
7,528 (1.77/day)
The right way is to stop the race to scale down and work on architectural improvements to the compute lines. Gateway width, more gateways, more and smart gates, more efficient predictors. Bigger and smart caches.
That's not going to happen the same way you'll always have better "phones" then TV/monitors/refrigerators/AC et al. In at least half of those categories you don't really "need" to upgrade!
 
Joined
Apr 26, 2023
Messages
128 (0.22/day)
It is the same as with 10nm. 20A and 18A is the same node just with improvements. So Arrow Lake 20A compute tile will be like Cannonlake. They will make enough of them to tell the shareholders they haven't lied about 5 nodes in 4 years. I'm wondering when Pat will tell he had an affair and needs to resign.
 
Joined
Apr 12, 2013
Messages
7,528 (1.77/day)
Not sure why Pat needs to be sacrificed at the altar to burn Intel, they're doing a fine job since at least Otellini. The rot IMO is close to 2 decades old now!
 
Joined
Apr 26, 2023
Messages
128 (0.22/day)
Not sure why Pat needs to be sacrificed at the altar to burn Intel, they're doing a fine job since at least Otellini. The rot IMO is close to 2 decades old now!
It is not his fault, but shareholders will demand someones head and CEO is natural choice. He hasn't caused these problems, but he was hired to fix Intel and he hasn't.
 
Joined
Nov 13, 2007
Messages
10,751 (1.73/day)
Location
Austin Texas
System Name stress-less
Processor 9800X3D @ 5.42GHZ
Motherboard MSI PRO B650M-A Wifi
Cooling Thermalright Phantom Spirit EVO
Memory 64GB DDR5 6400 CL30 / 2133 fclk
Video Card(s) RTX 4090 FE
Storage 2TB WD SN850, 4TB WD SN850X
Display(s) Alienware 32" 4k 240hz OLED
Case Jonsbo Z20
Audio Device(s) Yes
Power Supply Corsair SF750
Mouse DeathadderV2 X Hyperspeed
Keyboard 65% HE Keyboard
Software Windows 11
Benchmark Scores They're pretty good, nothing crazy.
It is not his fault, but shareholders will demand someones head and CEO is natural choice. He hasn't caused these problems, but he was hired to fix Intel and he hasn't.
The worst decision right now would be to get rid of Pat IMO. A change in direction now could actually be fatal.
 
Joined
Apr 26, 2023
Messages
128 (0.22/day)
The worst decision right now would be to get rid of Pat IMO. A change in direction now could actually be fatal.
I think they are already in critical state. They have fabs set to 4, 3, 20A and 18A manufacturing very little while they spent a lot of money on them. If 18A will be another flop their manufacturing branch will be useless and I doubt shareholders will accept investments in another nodes. 5 years ago they said their 10nm was poor while 7nm was great so they wanted to speed up switching from 10nm to 7nm, but a year later 7nm was delayed again and 10nm was renamed to Intel 7. I doubt spinning out their fabs is viable. When AMD did that, their fabs were in a better shape than Intel's are now. Also government gave them money for their factories upgrades and they wasted them. Will the government approve selling factories to TSMC or Samsung? I doubt it. Can they find a buyer in the US? So they must keep on financing unprofitable branch of their business.
 
Joined
Dec 1, 2020
Messages
460 (0.32/day)
Processor Ryzen 5 7600X
Motherboard ASRock B650M PG Riptide
Cooling Noctua NH-D15
Memory DDR5 6000Mhz CL28 32GB
Video Card(s) Nvidia Geforce RTX 3070 Palit GamingPro OC
Storage Corsair MP600 Force Series Gen.4 1TB
I think they are already in critical state. They have fabs set to 4, 3, 20A and 18A manufacturing very little while they spent a lot of money on them. If 18A will be another flop their manufacturing branch will be useless and I doubt shareholders will accept investments in another nodes. 5 years ago they said their 10nm was poor while 7nm was great so they wanted to speed up switching from 10nm to 7nm, but a year later 7nm was delayed again and 10nm was renamed to Intel 7. I doubt spinning out their fabs is viable. When AMD did that, their fabs were in a better shape than Intel's are now. Also government gave them money for their factories upgrades and they wasted them. Will the government approve selling factories to TSMC or Samsung? I doubt it. Can they find a buyer in the US? So they must keep on financing unprofitable branch of their business.
The think is that their 7nm (Intel 4) is garbage, it has 120 MTr/mm2, for comparison, their 10nm (intel 7) is 100 MTr/mm2. No wonder it's marginal better than their polished 10nm. Now lets see the TSMC 3nm, that will be used for Arrow and Lunar Lake - 200-220 MTr/mm2 and their mythical 18a won't be more than 160 MTr/mm2, 180 at most and it will be ready for 2026. They will release Arrow Lake in the end of 2024, refresh it with the same TSMC node in 2025 (Arrow Lake refresh) and when they are ready to release whatever is real upgrade over Arrow Lake, it will be in 2026 and how you see them to downgrade from 220 MTr/mm2 to their miserable 160 MTr/mm2? They won't, they will go again for the next TSMC node. Their fabs are so behind, that its no longer cost effective to build their own CPUs here, because this will hurt the performance and the competitiveness
 
Joined
Apr 14, 2018
Messages
655 (0.27/day)
They just stack all the cash the US has been pumping into them and burn it Joker style? I don’t think I’ve heard a single positive thing about Intel’s foundries for quite some time now.
 
Top