- Joined
- Aug 19, 2017
- Messages
- 2,606 (0.98/day)
TSMC has reportedly managed to produce yields at its Arizona facility that are on par with yields back home in Taiwan, making its expansion efforts successful. According to Bloomberg, TSMC did a trial production, a multi-month effort, to produce N4 node wafers with low defect rates. With wafers now in TSMC's labs for testing, it is reported that Arizona facility yields have achieved parity with their Taiwanese facilities back home. This indicates that TSMC's efforts to expand in the US are so far considered a success, as advanced chipmaking is a very complex process that is only done by a few makers and in very few locations. With TSMC expanding in the US now and proving that its technology can work on US soil, the company has a green light to start volume production in the first half of 2025.
However, this is only the beginning of TSMC's Arizona expansion. The Taiwanese giant plans to have a second fab operational by 2028 and produce 2 nm and 3 nm chips in the state. Additionally, there will be a third facility for 2 nm and more advanced nodes in Phoenix, bringing the total value of TSMC's US expansion efforts to $65 billion, with $6.6 billion from the CHIPS Act grants and $5 billion in loans from the US government. If upcoming fabs follow the lead of the first facility, US-based production needs will possibly be satisfied.
View at TechPowerUp Main Site | Source
However, this is only the beginning of TSMC's Arizona expansion. The Taiwanese giant plans to have a second fab operational by 2028 and produce 2 nm and 3 nm chips in the state. Additionally, there will be a third facility for 2 nm and more advanced nodes in Phoenix, bringing the total value of TSMC's US expansion efforts to $65 billion, with $6.6 billion from the CHIPS Act grants and $5 billion in loans from the US government. If upcoming fabs follow the lead of the first facility, US-based production needs will possibly be satisfied.
View at TechPowerUp Main Site | Source