• Welcome to TechPowerUp Forums, Guest! Please check out our forum guidelines for info related to our community.

SanDisk Announces Construction of Second Phase of Next-Generation Fab 5

btarunr

Editor & Senior Moderator
Staff member
Joined
Oct 9, 2007
Messages
47,244 (7.54/day)
Location
Hyderabad, India
System Name RBMK-1000
Processor AMD Ryzen 7 5700G
Motherboard ASUS ROG Strix B450-E Gaming
Cooling DeepCool Gammax L240 V2
Memory 2x 8GB G.Skill Sniper X
Video Card(s) Palit GeForce RTX 2080 SUPER GameRock
Storage Western Digital Black NVMe 512GB
Display(s) BenQ 1440p 60 Hz 27-inch
Case Corsair Carbide 100R
Audio Device(s) ASUS SupremeFX S1220A
Power Supply Cooler Master MWE Gold 650W
Mouse ASUS ROG Strix Impact
Keyboard Gamdias Hermes E2
Software Windows 11 Pro
SanDisk Corporation, a global leader in flash memory storage solutions, today announced that the construction of the phase two shell of the Fab 5 joint venture wafer fabrication facility located in Yokkaichi, Japan, will begin in August 2013 with expected completion in mid-2014.

SanDisk expects to use phase two of Fab 5 primarily for technology transitions of existing Yokkaichi wafer capacity. The new cleanroom will provide the space needed for additional equipment required for transitioning the wafer capacity in Fab 3, Fab 4 and phase one of Fab 5, to next generation 2D NAND technologies and to early generations of 3D NAND technology. The Fab 5 plans are consistent with the company's strategy outlined during SanDisk's Investor Day May 8 and there are no changes to SanDisk's capital expenditure plans.

Fab 5 will have an earthquake absorbing structure and is designed to minimize environmental impact. Extensive use of LED lighting throughout the facility and up-to-date energy-saving production facilities, along with full and effective use of waste heat, are expected to reduce CO2 emissions to a level 13 percent lower than for Fab 4.

View at TechPowerUp Main Site
 
Top