TheLostSwede
News Editor
- Joined
- Nov 11, 2004
- Messages
- 17,758 (2.42/day)
- Location
- Sweden
System Name | Overlord Mk MLI |
---|---|
Processor | AMD Ryzen 7 7800X3D |
Motherboard | Gigabyte X670E Aorus Master |
Cooling | Noctua NH-D15 SE with offsets |
Memory | 32GB Team T-Create Expert DDR5 6000 MHz @ CL30-34-34-68 |
Video Card(s) | Gainward GeForce RTX 4080 Phantom GS |
Storage | 1TB Solidigm P44 Pro, 2 TB Corsair MP600 Pro, 2TB Kingston KC3000 |
Display(s) | Acer XV272K LVbmiipruzx 4K@160Hz |
Case | Fractal Design Torrent Compact |
Audio Device(s) | Corsair Virtuoso SE |
Power Supply | be quiet! Pure Power 12 M 850 W |
Mouse | Logitech G502 Lightspeed |
Keyboard | Corsair K70 Max |
Software | Windows 10 Pro |
Benchmark Scores | https://valid.x86.fr/yfsd9w |
Nanya Technology, part of the Formosa Plastics Group, which is one of the largest conglomerates in Taiwan, will hold a ground-breaking ceremony for its new 12-inch fab that will be built in New Taipei City later this week. It'll be the biggest investment Nanya has done in the past decade, as the company is investing US$10.1 billion into building the new fab. This is obviously a lot less than TSMC is investing, but DRAM is made on different nodes to those that TSMC makes its customers products on, since DRAM doesn't benefit as much from node shrinking as other types of semiconductors.
The new fab will be located near one of Nanya's current fabs, in the Taishan district. Mass production is scheduled to start some time in 2025 and the fab is said to have a monthly capacity of around 45,000 wafers. Right now it's scheduled for a 10 nm technology node, but this might change by the time that the fab is up and running, especially considering that Nanya is already producing a range of 10 nm based products in some of its current fabs. Nanya's goal is to develop its next generation of 10 nm DRAM independently from other DRAM makers, as to avoid having to pay patent licence fees to its competitors.
View at TechPowerUp Main Site | Source
The new fab will be located near one of Nanya's current fabs, in the Taishan district. Mass production is scheduled to start some time in 2025 and the fab is said to have a monthly capacity of around 45,000 wafers. Right now it's scheduled for a 10 nm technology node, but this might change by the time that the fab is up and running, especially considering that Nanya is already producing a range of 10 nm based products in some of its current fabs. Nanya's goal is to develop its next generation of 10 nm DRAM independently from other DRAM makers, as to avoid having to pay patent licence fees to its competitors.
View at TechPowerUp Main Site | Source