• Welcome to TechPowerUp Forums, Guest! Please check out our forum guidelines for info related to our community.

NVIDIA Outsources 40 nm to Foundry Partners in Q2

btarunr

Editor & Senior Moderator
Staff member
Joined
Oct 9, 2007
Messages
47,298 (7.53/day)
Location
Hyderabad, India
System Name RBMK-1000
Processor AMD Ryzen 7 5700G
Motherboard ASUS ROG Strix B450-E Gaming
Cooling DeepCool Gammax L240 V2
Memory 2x 8GB G.Skill Sniper X
Video Card(s) Palit GeForce RTX 2080 SUPER GameRock
Storage Western Digital Black NVMe 512GB
Display(s) BenQ 1440p 60 Hz 27-inch
Case Corsair Carbide 100R
Audio Device(s) ASUS SupremeFX S1220A
Power Supply Cooler Master MWE Gold 650W
Mouse ASUS ROG Strix Impact
Keyboard Gamdias Hermes E2
Software Windows 11 Pro
With rival AMD having a production-grade 40 nm graphics processor, and UMC's recent announcement of being ready with a high-performance 40 nm manufacturing node, the conditions are increasingly favourable for NVIDIA to flag-off large-scale production of 40 nm GPUs. According to Chinese print-media Commercial Times, the company set its foundry outsourcing schedule for within Q2 2009, with TSMC and UMC being the regular foundry-partners.

Within this quarter, NVIDIA will start mass-production of the entry-level GT218, high-end mobile GT215 and mainstream desktop GT214 and GT216 GPUs. Additionally, the company may also expand its output for the 55 nm G200b high-end GPU.

View at TechPowerUp Main Site
 
Last edited:
Joined
Feb 22, 2009
Messages
409 (0.07/day)
Location
Grand Prairie Texas
System Name Little Girl
Processor Intel Q9650 @ 3.6GHz
Motherboard Gigabyte x48 DQ6
Cooling liquid cooling
Memory 4gb (2x2) OCZ DDR2 PC2-9200
Video Card(s) Gigabyte HD6950 unlock to Asus 6970 specs
Storage Crucial CT128M225 128gb SSD
Display(s) Acer 27" LCD @ 2048x1152
Case DIY (spit & glue, ducktape, cardboard)
Audio Device(s) On-board HD Audio
Power Supply ABS Tagan 850w
Software Win7 64bit
$50-$100 graphic card is still too much for system builder like me to make a good profit. $20-35 range and I'll grab a dozen but I'm just dreaming.
 
Joined
Apr 21, 2008
Messages
5,250 (0.86/day)
Location
IRAQ-Baghdad
System Name MASTER
Processor Core i7 3930k run at 4.4ghz
Motherboard Asus Rampage IV extreme
Cooling Corsair H100i
Memory 4x4G kingston hyperx beast 2400mhz
Video Card(s) 2X EVGA GTX680
Storage 2X Crusial M4 256g raid0, 1TbWD g, 2x500 WD B
Display(s) Samsung 27' 1080P LED 3D monitior 2ms
Case CoolerMaster Chosmos II
Audio Device(s) Creative sound blaster X-FI Titanum champion,Creative speakers 7.1 T7900
Power Supply Corsair 1200i, Logitch G500 Mouse, headset Corsair vengeance 1500
Software Win7 64bit Ultimate
Benchmark Scores 3d mark 2011: testing
40nm also dx11 we hear that before and we want to see
 

FryingWeesel

New Member
Joined
Mar 15, 2009
Messages
132 (0.02/day)
u, thred title is a bit..........well AFIK nvidia owns NO FABS and never has, they are a fabless company, so how could them outsorce something they dont insorce in the first place?
 

btarunr

Editor & Senior Moderator
Staff member
Joined
Oct 9, 2007
Messages
47,298 (7.53/day)
Location
Hyderabad, India
System Name RBMK-1000
Processor AMD Ryzen 7 5700G
Motherboard ASUS ROG Strix B450-E Gaming
Cooling DeepCool Gammax L240 V2
Memory 2x 8GB G.Skill Sniper X
Video Card(s) Palit GeForce RTX 2080 SUPER GameRock
Storage Western Digital Black NVMe 512GB
Display(s) BenQ 1440p 60 Hz 27-inch
Case Corsair Carbide 100R
Audio Device(s) ASUS SupremeFX S1220A
Power Supply Cooler Master MWE Gold 650W
Mouse ASUS ROG Strix Impact
Keyboard Gamdias Hermes E2
Software Windows 11 Pro
u, thred title is a bit..........well AFIK nvidia owns NO FABS and never has, they are a fabless company, so how could them outsorce something they dont insorce in the first place?

For every product NV makes, it signs fresh contracts with foundry companies. For a company to "outsource" a business process, it isn't necessary that the company does/did it internally too. Eg: companies with customer-care/warranty/logistics outsourced to other companies.
 
Top