- Joined
- Oct 9, 2007
- Messages
- 47,298 (7.53/day)
- Location
- Hyderabad, India
System Name | RBMK-1000 |
---|---|
Processor | AMD Ryzen 7 5700G |
Motherboard | ASUS ROG Strix B450-E Gaming |
Cooling | DeepCool Gammax L240 V2 |
Memory | 2x 8GB G.Skill Sniper X |
Video Card(s) | Palit GeForce RTX 2080 SUPER GameRock |
Storage | Western Digital Black NVMe 512GB |
Display(s) | BenQ 1440p 60 Hz 27-inch |
Case | Corsair Carbide 100R |
Audio Device(s) | ASUS SupremeFX S1220A |
Power Supply | Cooler Master MWE Gold 650W |
Mouse | ASUS ROG Strix Impact |
Keyboard | Gamdias Hermes E2 |
Software | Windows 11 Pro |
With rival AMD having a production-grade 40 nm graphics processor, and UMC's recent announcement of being ready with a high-performance 40 nm manufacturing node, the conditions are increasingly favourable for NVIDIA to flag-off large-scale production of 40 nm GPUs. According to Chinese print-media Commercial Times, the company set its foundry outsourcing schedule for within Q2 2009, with TSMC and UMC being the regular foundry-partners.
Within this quarter, NVIDIA will start mass-production of the entry-level GT218, high-end mobile GT215 and mainstream desktop GT214 and GT216 GPUs. Additionally, the company may also expand its output for the 55 nm G200b high-end GPU.
View at TechPowerUp Main Site
Within this quarter, NVIDIA will start mass-production of the entry-level GT218, high-end mobile GT215 and mainstream desktop GT214 and GT216 GPUs. Additionally, the company may also expand its output for the 55 nm G200b high-end GPU.
View at TechPowerUp Main Site
Last edited: