- Joined
- Oct 9, 2007
- Messages
- 47,300 (7.53/day)
- Location
- Hyderabad, India
System Name | RBMK-1000 |
---|---|
Processor | AMD Ryzen 7 5700G |
Motherboard | ASUS ROG Strix B450-E Gaming |
Cooling | DeepCool Gammax L240 V2 |
Memory | 2x 8GB G.Skill Sniper X |
Video Card(s) | Palit GeForce RTX 2080 SUPER GameRock |
Storage | Western Digital Black NVMe 512GB |
Display(s) | BenQ 1440p 60 Hz 27-inch |
Case | Corsair Carbide 100R |
Audio Device(s) | ASUS SupremeFX S1220A |
Power Supply | Cooler Master MWE Gold 650W |
Mouse | ASUS ROG Strix Impact |
Keyboard | Gamdias Hermes E2 |
Software | Windows 11 Pro |
Intel's 9th generation re-branding of its "Skylake-X Refresh" HEDT processors could have a rather short lifespan in the company's product-stack of just three quarters. Intel is planning to launch its next HEDT platform, codenamed "Glacier Falls," which succeeds the current "Basin Falls Refresh." "Glacier Falls" could launch around late-Q2/early-Q3, with unveils slated for Computex 2019 (June). These details are part of a slide leak from an internal presentation from motherboard manufacturer GIGABYTE.
The slide revealing "Glacier Falls" also mentions two new mainstream-desktop platform chipsets, the B365 Express and the H310C Express. There is no information on what sets these apart from the current B360 and H310, respectively. We predict their entry is necessitated by stronger CPU VRM requirements to support 9th generation Core 6-core and 8-core processor SKUs that are known to pull up to 140 Watts of power (unrelated to TDP, which is calculated on the basis of nominal clock speed and not Turbo Boost). There's also a faint possibility of Intel giving the B365 CPU overclocking support to compete with the value proposition of AMD's B450.
View at TechPowerUp Main Site
The slide revealing "Glacier Falls" also mentions two new mainstream-desktop platform chipsets, the B365 Express and the H310C Express. There is no information on what sets these apart from the current B360 and H310, respectively. We predict their entry is necessitated by stronger CPU VRM requirements to support 9th generation Core 6-core and 8-core processor SKUs that are known to pull up to 140 Watts of power (unrelated to TDP, which is calculated on the basis of nominal clock speed and not Turbo Boost). There's also a faint possibility of Intel giving the B365 CPU overclocking support to compete with the value proposition of AMD's B450.
View at TechPowerUp Main Site