• Welcome to TechPowerUp Forums, Guest! Please check out our forum guidelines for info related to our community.

Lenovo Officially Opens First European In-House Manufacturing Facility in Ullo, Hungary

TheLostSwede

News Editor
Joined
Nov 11, 2004
Messages
17,640 (2.41/day)
Location
Sweden
System Name Overlord Mk MLI
Processor AMD Ryzen 7 7800X3D
Motherboard Gigabyte X670E Aorus Master
Cooling Noctua NH-D15 SE with offsets
Memory 32GB Team T-Create Expert DDR5 6000 MHz @ CL30-34-34-68
Video Card(s) Gainward GeForce RTX 4080 Phantom GS
Storage 1TB Solidigm P44 Pro, 2 TB Corsair MP600 Pro, 2TB Kingston KC3000
Display(s) Acer XV272K LVbmiipruzx 4K@160Hz
Case Fractal Design Torrent Compact
Audio Device(s) Corsair Virtuoso SE
Power Supply be quiet! Pure Power 12 M 850 W
Mouse Logitech G502 Lightspeed
Keyboard Corsair K70 Max
Software Windows 10 Pro
Benchmark Scores https://valid.x86.fr/yfsd9w
Lenovo has today officially opened the doors to its first in-house manufacturing facility in Europe. Based in Ullo, Hungary, the factory focuses primarily on building server infrastructure, storage systems and high-end PC workstations used by customers throughout the Europe, Middle East, and Africa region. Extending Lenovo's international manufacturing operations, the investment represents significant economic potential for both the private and public sectors in Hungary, with increased production capacity, greater potential for collaboration with local vendors, and the creation of new job openings. The site already employs over 1,000 full-time staff in a variety of engineering, management & operational roles, with numbers continuing to increase as the facility moves towards full capacity.

Strong infrastructure, skilled labor and a location at the center of Europe made Hungary the natural location for Lenovo's first European in-house manufacturing facility. In addition, part of Lenovo's investment has been supported with local government incentives through the Hungarian Investment Promotion Agency (HIPA). Francois Bornibus, Senior Vice President and EMEA President, at Lenovo, commented: "With our manufacturing facility in Hungary officially open, we've reached a profound milestone in our global manufacturing network optimization and evolution. Hungary's well-connected location puts us much closer to our European customers so that we can fulfil and sustain their needs while remaining at the forefront of innovation. As our business continues to grow around the world, this incredible new facility will play a key role in our plans to ensure future success and bring smarter technology for all to Europe more sustainably, quickly and efficiently."




Róbert Ésik, CEO of the Hungarian Investment Promotion Agency (HIPA), added: "We are delighted that Lenovo, an industry leader with a long-established history in global manufacturing, has chosen to cooperate with us and locate its new facility in Hungary. With the site now officially open, we expect to see new collaboration opportunities for local suppliers contribute towards Hungary's prosperous economic environment."

Covering almost 50,000 square meters across two buildings and three floors, the new site is one of Lenovo's largest manufacturing facilities. The production line can produce more than 1,000 servers and 4,000 workstations a day - each one built specifically to customer requirements. Innovative automation capabilities are equipped throughout, including a first-class building management system operating on the shop floor and logistics area to monitor temperature, humidity, asset conditions and DIMM robotic labeling. This enables Lenovo to maintain optimal quality control of its products.

The new purpose- built building has been fitted with solar panels with a capacity of 0.5 megawatts - enough energy to power the equivalent of a small village. Building devices locally also dramatically reduces the freight miles these products incur, providing more efficient and sustainable transportation options. This combined with innovative manufacturing processes, such as Lenovo's patented low-temperature solder process, will help Lenovo achieve its science-based climate goals.

The Hungary facility is part of Lenovo's global manufacturing and supply chain strategy that serves customers in 180 markets from 35+ manufacturing sites around the world - including Argentina, Brazil, China, Germany, Hungary, India, Japan, Mexico and the USA. Lenovo is widely recognized for its global hybrid manufacturing model that includes a mix of both in-house and contract manufacturing. A key source of competitive advantage for the company, it provides greater efficiency and control over product development and supply chain operations, enabling customer needs to be responded to more effectively. In May 2022, Lenovo jumped seven places in a year, and is now ranked #9 in the Gartner Global Supply Chain Top 25 for 2022. The recognition highlights Lenovo's leadership as a purpose-driven organization and operational center of excellence in the global supply chain community.

In addition to creating new job opportunities in and around Ullo, Lenovo continues its commitment to support the local community through philanthropic activities such as technology donations for local schools and charities.


View at TechPowerUp Main Site | Source
 
Joined
Jan 3, 2021
Messages
3,501 (2.46/day)
Location
Slovenia
Processor i5-6600K
Motherboard Asus Z170A
Cooling some cheap Cooler Master Hyper 103 or similar
Memory 16GB DDR4-2400
Video Card(s) IGP
Storage Samsung 850 EVO 250GB
Display(s) 2x Oldell 24" 1920x1200
Case Bitfenix Nova white windowless non-mesh
Audio Device(s) E-mu 1212m PCI
Power Supply Seasonic G-360
Mouse Logitech Marble trackball, never had a mouse
Keyboard Key Tronic KT2000, no Win key because 1994
Software Oldwin
Well, it's obvious if you watch the promotional video. There's final assembly taking place here, just what I'd expect to see in a factory in EU | UK | US | developed world.
 

TheLostSwede

News Editor
Joined
Nov 11, 2004
Messages
17,640 (2.41/day)
Location
Sweden
System Name Overlord Mk MLI
Processor AMD Ryzen 7 7800X3D
Motherboard Gigabyte X670E Aorus Master
Cooling Noctua NH-D15 SE with offsets
Memory 32GB Team T-Create Expert DDR5 6000 MHz @ CL30-34-34-68
Video Card(s) Gainward GeForce RTX 4080 Phantom GS
Storage 1TB Solidigm P44 Pro, 2 TB Corsair MP600 Pro, 2TB Kingston KC3000
Display(s) Acer XV272K LVbmiipruzx 4K@160Hz
Case Fractal Design Torrent Compact
Audio Device(s) Corsair Virtuoso SE
Power Supply be quiet! Pure Power 12 M 850 W
Mouse Logitech G502 Lightspeed
Keyboard Corsair K70 Max
Software Windows 10 Pro
Benchmark Scores https://valid.x86.fr/yfsd9w
Well, it's obvious if you watch the promotional video. There's final assembly taking place here, just what I'd expect to see in a factory in EU | UK | US | developed world.
Dell used to do that in Ireland. Then they moved it all to the PRC and deliver times went up from a week to a month plus...
The Irish location seems to be some kind of customer support centre now.
It was a really nice assembly plant when I was there some 20+ years ago.
 

the54thvoid

Super Intoxicated Moderator
Staff member
Joined
Dec 14, 2009
Messages
13,051 (2.39/day)
Location
Glasgow - home of formal profanity
Processor Ryzen 7800X3D
Motherboard MSI MAG Mortar B650 (wifi)
Cooling be quiet! Dark Rock Pro 4
Memory 32GB Kingston Fury
Video Card(s) Gainward RTX4070ti
Storage Seagate FireCuda 530 M.2 1TB / Samsumg 960 Pro M.2 512Gb
Display(s) LG 32" 165Hz 1440p GSYNC
Case Asus Prime AP201
Audio Device(s) On Board
Power Supply be quiet! Pure POwer M12 850w Gold (ATX3.0)
Software W10
Thread locked for political clean up. Reopened.

TPU doesn't encourage political posts in the forums. Whether the opinion is valid or not, the result tends toward partisan 'bickering' which derails the message in the OP. If you wish to discuss my full rationale, please PM me. Do not create a drama in the thread.

Thank you.
 
Last edited:
Joined
Jan 14, 2019
Messages
12,341 (5.76/day)
Location
Midlands, UK
System Name Nebulon B
Processor AMD Ryzen 7 7800X3D
Motherboard MSi PRO B650M-A WiFi
Cooling be quiet! Dark Rock 4
Memory 2x 24 GB Corsair Vengeance DDR5-4800
Video Card(s) AMD Radeon RX 6750 XT 12 GB
Storage 2 TB Corsair MP600 GS, 2 TB Corsair MP600 R2
Display(s) Dell S3422DWG, 7" Waveshare touchscreen
Case Kolink Citadel Mesh black
Audio Device(s) Logitech Z333 2.1 speakers, AKG Y50 headphones
Power Supply Seasonic Prime GX-750
Mouse Logitech MX Master 2S
Keyboard Logitech G413 SE
Software Bazzite (Fedora Linux) KDE
Hungary makes sense. A 5-year tax exemption, a fairly central location within Europe, cheap labour (one of the cheapest in the EU), lots of sun for the solar panels...

Oh and it's Üllő, by the way. :)
 
Joined
Jul 16, 2014
Messages
8,198 (2.16/day)
Location
SE Michigan
System Name Dumbass
Processor AMD Ryzen 7800X3D
Motherboard ASUS TUF gaming B650
Cooling Artic Liquid Freezer 2 - 420mm
Memory G.Skill Sniper 32gb DDR5 6000
Video Card(s) GreenTeam 4070 ti super 16gb
Storage Samsung EVO 500gb & 1Tb, 2tb HDD, 500gb WD Black
Display(s) 1x Nixeus NX_EDG27, 2x Dell S2440L (16:9)
Case Phanteks Enthoo Primo w/8 140mm SP Fans
Audio Device(s) onboard (realtek?) - SPKRS:Logitech Z623 200w 2.1
Power Supply Corsair HX1000i
Mouse Steeseries Esports Wireless
Keyboard Corsair K100
Software windows 10 H
Benchmark Scores https://i.imgur.com/aoz3vWY.jpg?2
Hungary makes sense. A 5-year tax exemption, a fairly central location within Europe, cheap labour (one of the cheapest in the EU), lots of sun for the solar panels...

Oh and it's Üllő, by the way. :)

The new purpose- built building has been fitted with solar panels with a capacity of 0.5 megawatts - enough energy to power the equivalent of a small village.

did they install enough solar panels? 0.5Mw doesnt seem enough for that huge building.:pimp:

(@W1zzard can we have the ability to insert +quotes into reply edits, not only new replies?)
 
Last edited:
Top