• Welcome to TechPowerUp Forums, Guest! Please check out our forum guidelines for info related to our community.

Intel to Start High-Volume EUV Production in Ireland, Intel 4 Node Enters Mass-production

btarunr

Editor & Senior Moderator
Staff member
Joined
Oct 9, 2007
Messages
47,233 (7.55/day)
Location
Hyderabad, India
System Name RBMK-1000
Processor AMD Ryzen 7 5700G
Motherboard ASUS ROG Strix B450-E Gaming
Cooling DeepCool Gammax L240 V2
Memory 2x 8GB G.Skill Sniper X
Video Card(s) Palit GeForce RTX 2080 SUPER GameRock
Storage Western Digital Black NVMe 512GB
Display(s) BenQ 1440p 60 Hz 27-inch
Case Corsair Carbide 100R
Audio Device(s) ASUS SupremeFX S1220A
Power Supply Cooler Master MWE Gold 650W
Mouse ASUS ROG Strix Impact
Keyboard Gamdias Hermes E2
Software Windows 11 Pro
Intel Foundry Services (IFS) today announced that it will commence mass-production on its first silicon fabrication node that leverages extreme ultraviolet (EUV) lithography, Intel 4. On September 29, the Intel 4 node will start rolling at the company's facility in Leixlip, Ireland, dubbed Fab 34. CEO Pat Gelsinger, Dr. Ann Kelleher, general manager of Technology Development at Intel, and Keyvan Esfarjani, chief global operations officer, will be present at a ceremony commemorating production of the first wafers.

Intel 4 is an advanced foundry that leverages EUV, and offers both transistor densities and electrical characteristics comparable to TSMC's 5 nm-class and 4 nm-class foundry nodes. Among the first chips to be built are the compute tiles of the company's Core "Meteor Lake" processors, which contain their next-generation CPU cores. Compared to the current Intel 7 node, Intel 4 offers double the area scaling for logic libraries, a 20% iso-power improvement, and introduces the new metal-insulator-metal (MIM) capacitor.



View at TechPowerUp Main Site
 
Joined
Jan 11, 2022
Messages
871 (0.83/day)
Is this for the gen 14 mobile parts entering the market in a couple of months?
seems a bit fast no?
 
Joined
Dec 12, 2016
Messages
1,840 (0.63/day)
Is this for the gen 14 mobile parts entering the market in a couple of months?
seems a bit fast no?
Reading this will answer your question.

 
Joined
Aug 18, 2022
Messages
365 (0.44/day)
Is this for the gen 14 mobile parts entering the market in a couple of months?
seems a bit fast no?
No longer gen 14, gens have been dropped. Now Core Ultra processors on Meteor Lake. Performance per watt is the priority on ML, let's see what performance looks like when retail units are reviewed.
 
Joined
Aug 12, 2022
Messages
248 (0.30/day)
If these are coming to market in December, then wouldn't the fab have started producing early versions of the chips months ago? And what's with all the engineering samples and demos if no chip has been produced?

I'm picturing that maybe another fab has been producing the chips and now this one is ready to produce them as well.
 
Joined
Mar 14, 2018
Messages
91 (0.04/day)
So, Intel built whole high-volume fab only to produce small compute tiles (70 sqmm each) ? Hard to believe, as capacity is much bigger to handle such demand. They will probably release also MTL-S with bigger compute tile
 
Joined
May 3, 2019
Messages
2,097 (1.03/day)
System Name BigRed
Processor I7 12700k
Motherboard Asus Rog Strix z690-A WiFi D4
Cooling Noctua D15S chromax black/MX6
Memory TEAM GROUP 32GB DDR4 4000C16 B die
Video Card(s) MSI RTX 3080 Gaming Trio X 10GB
Storage M.2 drives WD SN850X 1TB 4x4 BOOT/WD SN850X 4TB 4x4 STEAM/USB3 4TB OTHER
Display(s) Dell s3422dwg 34" 3440x1440p 144hz ultrawide
Case Corsair 7000D
Audio Device(s) Logitech Z5450/KEF uniQ speakers/Bowers and Wilkins P7 Headphones
Power Supply Corsair RM850x 80% gold
Mouse Logitech G604 lightspeed wireless
Keyboard Logitech G915 TKL lightspeed wireless
Software Windows 10 Pro X64
Benchmark Scores Who cares
So, Intel built whole high-volume fab only to produce small compute tiles (70 sqmm each) ? Hard to believe, as capacity is much bigger to handle such demand. They will probably release also MTL-S with bigger compute tile

Isn't the compute tile the actual cores? TSMC is i believe building the GPU dies.
 
Joined
Aug 18, 2022
Messages
365 (0.44/day)
So, Intel built whole high-volume fab only to produce small compute tiles (70 sqmm each) ? Hard to believe, as capacity is much bigger to handle such demand. They will probably release also MTL-S with bigger compute tile
Intel is expecting to sell tens of millions of Meteor Lake mobile processors, so yes a high-volume fab is needed for that.
 
Joined
Jan 11, 2022
Messages
871 (0.83/day)
Reading this will answer your question.

They are still doing the whole (generation)(class)(productnumber) thing while it’s a totally Different chip for mobile than it is desktop

all they dumped is the I moniker.
 
Joined
Aug 18, 2022
Messages
365 (0.44/day)
They are still doing the whole (generation)(class)(productnumber) thing while it’s a totally Different chip for mobile than it is desktop

all they dumped is the I moniker.
Arrow Lake is scheduled for the desktop in 2024. It should be similar to Meteor Lake, probably with a larger computer tile to allow 8 P cores, but will keep Low Power E-cores? It will have a Neural Processing Unit for sure. Intel may refer to both Meteor Lake and Arrow Lake as Series 1 now that the gen naming has been dropped.
 
Last edited:

hs4

Joined
Feb 15, 2022
Messages
106 (0.10/day)
Arrow Lake is scheduled for the desktop in 2024. It should be similar to Meteor Lake, probably with a larger computer tile to allow 8 P cores, but will keep Low Power E-cores? It will have a Neural Processing Unit for sure. Intel may refer to both Meteor Lake and Arrow Lake as Series 1 now that the gen naming has been dropped.
Arrow lake compute tiles can grow smaller albeit with more cores. Although the scaling of Intel 20A has not been announced, it is thought that the density will increase because the fins that were arranged horizontally will be stacked vertically, and the metal layers will be devided into frontside-backside and they also be stacked vertically with PowerVIA.

OneRaichu said that the SoC tiles are common or very similar between MTL and ARL, so the LP-E core will remain Crestmont, even though ARL's compute tile will use Skymont. There is. (It seems that the LP-E core will also be Skymont in LNL)
 
Joined
Aug 12, 2022
Messages
248 (0.30/day)
Arrow lake compute tiles can grow smaller albeit with more cores. Although the scaling of Intel 20A has not been announced, it is thought that the density will increase because the fins that were arranged horizontally will be stacked vertically, and the metal layers will be devided into frontside-backside and they also be stacked vertically with PowerVIA.

OneRaichu said that the SoC tiles are common or very similar between MTL and ARL, so the LP-E core will remain Crestmont, even though ARL's compute tile will use Skymont. There is. (It seems that the LP-E core will also be Skymont in LNL)
If the LP-E is Crestmont, then Crestmont's ISA will be the ISA of Arrow Lake. So no new instructions, no AVX10 (unless Crestmont already has it). That has the potential to be a disappointment.

I also am a little skeptical though. Meteor Lake is built with Intel 4 for the compute tile and TSMC N6 for the SoC tile and its LP-E cores. Despite N6 being an older node it should be perfectly fine next to Intel 4 because it's a density-optimized node and Intel 4 is frequency-optimized. But if the compute tile is upgraded to Intel 20A complete with newer cores, then Crestmont on N6 is also going to start to look bad for battery life.
 

hs4

Joined
Feb 15, 2022
Messages
106 (0.10/day)
If the LP-E is Crestmont, then Crestmont's ISA will be the ISA of Arrow Lake. So no new instructions, no AVX10 (unless Crestmont already has it). That has the potential to be a disappointment.

I also am a little skeptical though. Meteor Lake is built with Intel 4 for the compute tile and TSMC N6 for the SoC tile and its LP-E cores. Despite N6 being an older node it should be perfectly fine next to Intel 4 because it's a density-optimized node and Intel 4 is frequency-optimized. But if the compute tile is upgraded to Intel 20A complete with newer cores, then Crestmont on N6 is also going to start to look bad for battery life.
According to the Intel's ISA Reference Guide,
1. Arrow lake has two different CPUID: 06_C5H & 06_C6H.
2. 06_C6H is described as "Arrow lake-S".
3. Both supports ISA supported by Sierra Forest except Xeon-mandatory instructions.
4. Some instructions are only supported by "Arrow lake-S" 06_C6H and Lunar lake.

The most likely scenario is that ARL-H shares a SoC tile with MTL-H, resulting in smaller supported instructions, and ARL-S and LNL-M create new SoC tiles, which use Skymont as the LP-E core. I think it will be installed.
 
Joined
Aug 12, 2022
Messages
248 (0.30/day)
According to the Intel's ISA Reference Guide,
1. Arrow lake has two different CPUID: 06_C5H & 06_C6H.
2. 06_C6H is described as "Arrow lake-S".
3. Both supports ISA supported by Sierra Forest except Xeon-mandatory instructions.
4. Some instructions are only supported by "Arrow lake-S" 06_C6H and Lunar lake.

The most likely scenario is that ARL-H shares a SoC tile with MTL-H, resulting in smaller supported instructions, and ARL-S and LNL-M create new SoC tiles, which use Skymont as the LP-E core. I think it will be installed.
Thanks for explaining. So desktop chips will get a new SoC tile and mobile will reuse the one from Meteor Lake. It sounds like a little bit of a bummer on mobile, but probably not a big deal. The average mobile user probably wouldn't benefit from the new instructions, and while I did also mention a battery life concern, Meteor Lake is supposed to have great battery life so using its SoC should be alright.
 

hs4

Joined
Feb 15, 2022
Messages
106 (0.10/day)
Thanks for explaining. So desktop chips will get a new SoC tile and mobile will reuse the one from Meteor Lake. It sounds like a little bit of a bummer on mobile, but probably not a big deal. The average mobile user probably wouldn't benefit from the new instructions, and while I did also mention a battery life concern, Meteor Lake is supposed to have great battery life so using its SoC should be alright.
I just checked again, and the latest manual is out after Intel Innovation, and it seems that Clearwater Forest supports instructions (such as AVX-VNNI-INT16) that only ARL-S and LNL-M supported.

Since AVX10.1 only supports Granite Rapids, it seems that AVX10.2 seems to be the next generation of Skymont.
 
Top