- Joined
- Oct 9, 2007
- Messages
- 47,290 (7.53/day)
- Location
- Hyderabad, India
System Name | RBMK-1000 |
---|---|
Processor | AMD Ryzen 7 5700G |
Motherboard | ASUS ROG Strix B450-E Gaming |
Cooling | DeepCool Gammax L240 V2 |
Memory | 2x 8GB G.Skill Sniper X |
Video Card(s) | Palit GeForce RTX 2080 SUPER GameRock |
Storage | Western Digital Black NVMe 512GB |
Display(s) | BenQ 1440p 60 Hz 27-inch |
Case | Corsair Carbide 100R |
Audio Device(s) | ASUS SupremeFX S1220A |
Power Supply | Cooler Master MWE Gold 650W |
Mouse | ASUS ROG Strix Impact |
Keyboard | Gamdias Hermes E2 |
Software | Windows 11 Pro |
Intel's silicon fabrication woes refuse to torment the company's product roadmaps, with the company disclosing in its Q2-2020 financial results release that the company's first CPUs built on the 7 nanometer silicon fabrication node are delayed by a year due to a further 6-month delay from prior expectations. The company will focus on getting its 10 nm node up to scale in the meantime.
The company mentioned that the 10 nm "Tiger Lake" mobile processor and "Ice Lake-SP" enterprise processor remains on-track for 2020. The company's 12th Generation Core "Alder Lake-S" desktop processors won't arrive before the second half of 2021. In the meantime, Intel will launch its 11th Gen Core "Rocket Lake" processor on the 14 nm node, but with increased IPC from the new "Cypress Cove" CPU cores. Also in 2H-2021, the company will launch its "Sapphire Rapids" enterprise processors that come with next-gen connectivity and updated CPU cores.
It's interesting to note that Intel was specific about "CPU" when talking about 7 nm, meaning that Intel's foundry woes only affect its CPU product stack, and not a word was mentioned in the release about the company's discrete GPU and scalar compute processors that are being prototyped and validated. This is probably the biggest hint we'll ever get from Intel that the company's dGPUs are being designed for third-party foundries (such as Samsung or TSMC), and that the Xe dGPU product roadmap is disconnected from that of Intel's fabs.
Intel's post results call also revealed a handful interesting tentative dates. For starters, "Tiger Lake" is shipping in "a matter of weeks," indicating an imminent launch ahead of the "Back to School" shopping season. Next up, the company's high-performance scalar compute processor, codenamed "Ponte Vecchio" remains slated for 2021-22, and given that it's reportedly being designed for 7 nm, we have our next big hint confirmation that these dGPUs will be built on third-party 7 nm fabs. Intel did mention that the Foveros packaging technology could be further developed over the years, and its upcoming discrete GPUs could combine dies (tiles) from multiple sources, which could include its own fabs.
Given the delays in Intel's 7 nm foundry node, the first Intel client-segment processors based on the node won't arrive before late-2022 or 2023, which means refinements of the current 10 nm silicon fabrication node should support Intel's client-segment product stack for the foreseeable future. The first enterprise 7 nm processors will arrive by the first half of 2023. Intel also mentioned that they expect to see "one full node improvement" from a refined 10 nanometer process, which isn't surprising, given how much experience they have improving their 14 nanometer process.
View at TechPowerUp Main Site
The company mentioned that the 10 nm "Tiger Lake" mobile processor and "Ice Lake-SP" enterprise processor remains on-track for 2020. The company's 12th Generation Core "Alder Lake-S" desktop processors won't arrive before the second half of 2021. In the meantime, Intel will launch its 11th Gen Core "Rocket Lake" processor on the 14 nm node, but with increased IPC from the new "Cypress Cove" CPU cores. Also in 2H-2021, the company will launch its "Sapphire Rapids" enterprise processors that come with next-gen connectivity and updated CPU cores.
It's interesting to note that Intel was specific about "CPU" when talking about 7 nm, meaning that Intel's foundry woes only affect its CPU product stack, and not a word was mentioned in the release about the company's discrete GPU and scalar compute processors that are being prototyped and validated. This is probably the biggest hint we'll ever get from Intel that the company's dGPUs are being designed for third-party foundries (such as Samsung or TSMC), and that the Xe dGPU product roadmap is disconnected from that of Intel's fabs.
Intel is accelerating its transition to 10 nm products this year with increasing volumes and strong demand for an expanding line up. This includes a growing portfolio of 10 nm-based Intel Core processors with "Tiger Lake" launching soon, and the first 10 nm-based server CPU "Ice Lake," which remains planned for the end of this year. In the second half of 2021, Intel expects to deliver a new line of client CPU's (code-named "Alder Lake"), which will include its first 10 nm-based desktop CPU, and a new 10 nm-based server CPU (code-named "Sapphire Rapids"). The company's 7 nm-based CPU product timing is shifting approximately six months relative to prior expectations. The primary driver is the yield of Intel's 7 nm process, which based on recent data, is now trending approximately twelve months behind the company's internal target.
Intel's post results call also revealed a handful interesting tentative dates. For starters, "Tiger Lake" is shipping in "a matter of weeks," indicating an imminent launch ahead of the "Back to School" shopping season. Next up, the company's high-performance scalar compute processor, codenamed "Ponte Vecchio" remains slated for 2021-22, and given that it's reportedly being designed for 7 nm, we have our next big hint confirmation that these dGPUs will be built on third-party 7 nm fabs. Intel did mention that the Foveros packaging technology could be further developed over the years, and its upcoming discrete GPUs could combine dies (tiles) from multiple sources, which could include its own fabs.
Given the delays in Intel's 7 nm foundry node, the first Intel client-segment processors based on the node won't arrive before late-2022 or 2023, which means refinements of the current 10 nm silicon fabrication node should support Intel's client-segment product stack for the foreseeable future. The first enterprise 7 nm processors will arrive by the first half of 2023. Intel also mentioned that they expect to see "one full node improvement" from a refined 10 nanometer process, which isn't surprising, given how much experience they have improving their 14 nanometer process.
View at TechPowerUp Main Site