• Welcome to TechPowerUp Forums, Guest! Please check out our forum guidelines for info related to our community.

Intel China Presentation Slide Indicates Early 2026 Volume Launch of Panther Lake

T0@st

News Editor
Joined
Mar 7, 2023
Messages
2,695 (3.62/day)
Location
South East, UK
System Name The TPU Typewriter
Processor AMD Ryzen 5 5600 (non-X)
Motherboard GIGABYTE B550M DS3H Micro ATX
Cooling DeepCool AS500
Memory Kingston Fury Renegade RGB 32 GB (2 x 16 GB) DDR4-3600 CL16
Video Card(s) PowerColor Radeon RX 7800 XT 16 GB Hellhound OC
Storage Samsung 980 Pro 1 TB M.2-2280 PCIe 4.0 X4 NVME SSD
Display(s) Lenovo Legion Y27q-20 27" QHD IPS monitor
Case GameMax Spark M-ATX (re-badged Jonsbo D30)
Audio Device(s) FiiO K7 Desktop DAC/Amp + Philips Fidelio X3 headphones, or ARTTI T10 Planar IEMs
Power Supply ADATA XPG CORE Reactor 650 W 80+ Gold ATX
Mouse Roccat Kone Pro Air
Keyboard Cooler Master MasterKeys Pro L
Software Windows 10 64-bit Home Edition
According to an attendee of a recent Intel AI presentation, company representatives revealed a release timeline for next-gen Core Ultra "Panther Lake" mobile processor family. Team Blue's China office appears to be courting users of DeepSeek R1, as evidenced by meng59739449's sharing of a processor product roadmap (machine translated by VideoCardz). A volume launch of Core Ultra 300 "Panther Lake-H" series seems to be on the cards for Q1 2026. Earlier this month, an Intel executive insisted that Panther Lake was on track for a second half of 2025 roll out. Lately, industry moles have alleged that a "problematic 18A node" process has caused delays across new generation product lines.

Team Blue watchdogs reckon that high volume manufacturing (HVM) of Panther Lake chips will kick off in September. By October, an Early Enablement Program (EEP) is expected to start—with samples sent off to OEMs for full approval. Industry experts believe that Intel will following a familiar pattern of "announcing the processor in the second half of the prior year, but ramping up mass production in the following year." Previous generation mobile CPU platforms—Meteor Lake and Lunar Lake—received similar treatment in the recent past. Last week, a Panther Lake-H (PTL-H) sample was on general display at Embedded World 2025—the German office is similarly engaged in hyping up the AI-crunching capabilities of roadmapped products.



View at TechPowerUp Main Site | Source
 
Joined
Aug 12, 2022
Messages
278 (0.29/day)
It's pretty much what can be expected with a "2025 H2" launch date. Intel 4 similarly was in just a handful of laptops in December 2023 and reached a lot more devices early the following year. This means it'll be a full two years between major nodes, so 18A may be an ambitious node but it's not on a faster timeline. But 10nm was like five years after 14nm and Intel 4 about four years after 10nm so it is at least a shorter time to market than its two immediate predecessors. Assuming it meets this timeline.
 
Joined
Apr 23, 2020
Messages
134 (0.07/day)
Oh man, it's 10nm all over again.
The intel i7 265 are 3nm right?

18A would be 1.8nm.

Ryzen 9800x3D is 4nm.

I think you have no idea what you're talking about, chips below 5nm are extremely difficult to make.

So 3nm is already a success, it's impossible to go from 3nm to 1nm.
 
Joined
Sep 15, 2024
Messages
59 (0.32/day)
This article along with having it put as “Panther Lake in 2026” onto the top of the main page feels like yet another slight against Intel. At the bottom of this piece, along with the very one you’ve linked (I’ve just noticed, it’s yours!), you’re spelling out why: Intel’s messaging has been consistent for quite a while now: It will launch in 2025, it will gain volume in 2026. This is similar to many other recent launches.

I’ll show part of the other article:
[John] Pitzer elaborated on the topic of production punctuality: "[…] Now I'll remind you that we will launch Panther Lake in the second half of this year. In a similar vein, we launched Meteor Lake in the second half of 2023. It wasn't until 2024 that it became real volume. We launched Lunar Lake in the second half of last year, and this is the year where it becomes real volume. And as we've said on Panther Lake, we launched in the second half of this year, but it's really not until next year that we get to that volumes where it really starts to help improve the margin profile of the overall company... […]"
 
Joined
Jul 17, 2011
Messages
103 (0.02/day)
System Name Custom build, AMD/ATi powered.
Processor AMD FX™ 8350 [8x4.6 GHz]
Motherboard AsRock 970 Extreme3 R2.0
Cooling be quiet! Dark Rock Advanced C1
Memory Crucial, Ballistix Tactical, 16 GByte, 1866, CL9
Video Card(s) AMD Radeon HD 7850 Black Edition, 2 GByte GDDR5
Storage 250/500/1500/2000 GByte, SSD: 60 GByte
Display(s) Samsung SyncMaster 950p
Case CoolerMaster HAF 912 Pro
Audio Device(s) 7.1 Digital High Definition Surround
Power Supply be quiet! Straight Power E9 CM 580W
Software Windows 7 Ultimate x64, SP 1
This article along with having it put as “Panther Lake in 2026” onto the top of the main page feels like yet another slight against Intel.
Yes, since that's what you want it to be see it as – It is the polar opposite of it.
Since Intel itself already declared, that Panther Lake will be de-facto a paper-launch in December (legally holding their road-maps…), with volume only coming by mid of 2026.
So this news' head-line of Panther Lake being 'early 2026 volume', is actually the opposite of a slight against Intel as you put it, as it indicates actual volume way earlier than initially expected, like 6 months earlier …

At the bottom of this piece, along with the very one you’ve linked (I’ve just noticed, it’s yours!), you’re spelling out why: Intel’s messaging has been consistent for quite a while now: It will launch in 2025, it will gain volume in 2026. This is similar to many other recent launches.
No, it isn't. Intel itself delayed from 1H25, then middle of 2025 (as Gelsinger himself declared back then), to now 2H25 in January, while recently signalling, that actual volume might come only by the middle of 2026 – This news here is a net-positive, you have to read is as such. Since it indicates a actual pull in of volume by half a year …

Just a sound advice: Leave feelings™ out of it – Use logic instead. Better yet, use logos!
1742309834722.png
 
Joined
Jan 27, 2015
Messages
1,813 (0.49/day)
System Name Legion
Processor i7-12700KF
Motherboard Asus Z690-Plus TUF Gaming WiFi D5
Cooling Arctic Liquid Freezer 2 240mm AIO
Memory PNY MAKO DDR5-6000 C36-36-36-76
Video Card(s) PowerColor Hellhound 6700 XT 12GB
Storage WD SN770 512GB m.2, Samsung 980 Pro m.2 2TB
Display(s) Acer K272HUL 1440p / 34" MSI MAG341CQ 3440x1440
Case Montech Air X
Power Supply Corsair CX750M
Mouse Logitech MX Anywhere 25
Keyboard Logitech MX Keys
Software Lots
Here it’s just a name, without any connection to the meaning of the scale.

All of TSMC nodes are the same, TSMC N3 is not 3nm nor is N2 2nm. For that matter, N7 was not 7nm.
 
Joined
Sep 5, 2024
Messages
41 (0.21/day)
Processor Ryzen 3700X
Motherboard MSI B550
Cooling DeepCool AK620. 3 x 140mm intake fans, 1 x 140mm exhaust fan
Memory 32 Gb DDR4 3000
Video Card(s) RX 6750 XT
Storage NVME, SATA SSD and NAS HDD
Display(s) Dell 24' 1440p, Samsung 24' 1080p
Case Fractal Design Define 7
Audio Device(s) Onboard
Power Supply Super Flower ATX 3.0 850w
Mouse Corsair M65
Keyboard Corsair mechanical
Software Win 10, Ubuntu 24.04 LTS
All of TSMC nodes are the same, TSMC N3 is not 3nm nor is N2 2nm. For that matter, N7 was not 7nm.

I'm fairly sure it well known to most visitors of this site that names have no relation to scale anymore for all foundries.
 
Joined
Sep 15, 2024
Messages
59 (0.32/day)
Leave feelings™ out of it – Use logic instead. Better yet, use logos!
1742309834722.png

Leaving your bottom-tier logic aside (what’s logos, even, are you Greek?):

while recently signalling, that actual volume might come only by the middle of 2026

Links plz, I’m not seeing it in the first five pages of https://www.google.com/search?q=panther+lake+volume+production+middle+2026


You can take “launch in 2025, volume in 2026” from this article, (Published? April 3rd 2024):
"The bulk of our wafers in 2025 are driven by Intel 7 and Intel 10," Gelsinger said. "So, that moderates the margin benefits that we get as we ramp the new EUV nodes, so we will see a good amount of Intel 3 in 2025, small amounts of 18A wafers [in 2025], [but] we will see a good amount of 18A wafers in 2026. […] Obviously, those volumes just continue to swing to more modern post-DUV nodes over the horizon."
 
Joined
Jan 27, 2015
Messages
1,813 (0.49/day)
System Name Legion
Processor i7-12700KF
Motherboard Asus Z690-Plus TUF Gaming WiFi D5
Cooling Arctic Liquid Freezer 2 240mm AIO
Memory PNY MAKO DDR5-6000 C36-36-36-76
Video Card(s) PowerColor Hellhound 6700 XT 12GB
Storage WD SN770 512GB m.2, Samsung 980 Pro m.2 2TB
Display(s) Acer K272HUL 1440p / 34" MSI MAG341CQ 3440x1440
Case Montech Air X
Power Supply Corsair CX750M
Mouse Logitech MX Anywhere 25
Keyboard Logitech MX Keys
Software Lots
I'm fairly sure it well known to most visitors of this site that names have no relation to scale anymore for all foundries.

It should be, but look at the posts and it's not. For that matter, many tech 'journalists' seem to be entirely ignorant of this point. I love bashing the ones that say 'Intel 7 (10nm)' but then proceed to call TSMC N3 '3nm'. It happens all the time, every day of the week.
 

ejolson

New Member
Joined
Dec 23, 2024
Messages
3 (0.03/day)
The name Panther Lake is similar to the name of the town where I live. Even so, I don't know what to do with four performance, eight efficiency and four extra low power efficiency cores along with a NPU and a GPU. This is like having five different computers bundled into the same machine.
 

oddrobert

New Member
Joined
Dec 28, 2024
Messages
17 (0.21/day)
pr Ye men it's coming out 2024 for sure
pr men h2 2024 we do 20A, and then we go hard on 18A 2025
Reality outsource whole thing and it's kinda meh

pr men h2 2025 we will have it 18a
pr 2026 you say.


Intel 10 late
intel 7 300w overheating disaster
intel 4, 3 skipped
intel 18 delayed 2 years now ? Announced too early, I guess

Don't get me wrong, if Intel deliver leap frog approach, it will be still impressive vs a giant like TSMC.
zen6 in 2026 is rumoured to still not be N2 TSMC, which will be comparative to 18A ( gaafet).


If intel pumps out its A18 premium GPUs and CPUs around 2027 will be awesome.
So if we get 2028 good cpus and gpus with generational leap i wull be happy but it will be time
PS6 will come out and new upgrade cyrcle begins.






So we can expect some N2 TSCM/ 18A intel parts 2027 at best
then TSMC will do that whole back delivery thing
N2B
And yet again with amount of Monopoles like TSMC and greedvidia selling pc and don't caring about tech till market will get in healthier state will be better I guess.
 
Top