• Welcome to TechPowerUp Forums, Guest! Please check out our forum guidelines for info related to our community.

Intel CEO Discloses TSMC Production Details: N3 for Arrow Lake & N3B for Lunar Lake

T0@st

News Editor
Joined
Mar 7, 2023
Messages
3,063 (3.89/day)
Location
South East, UK
System Name The TPU Typewriter
Processor AMD Ryzen 5 5600 (non-X)
Motherboard GIGABYTE B550M DS3H Micro ATX
Cooling DeepCool AS500
Memory Kingston Fury Renegade RGB 32 GB (2 x 16 GB) DDR4-3600 CL16
Video Card(s) PowerColor Radeon RX 7800 XT 16 GB Hellhound OC
Storage Samsung 980 Pro 1 TB M.2-2280 PCIe 4.0 X4 NVME SSD
Display(s) Lenovo Legion Y27q-20 27" QHD IPS monitor
Case GameMax Spark M-ATX (re-badged Jonsbo D30)
Audio Device(s) FiiO K7 Desktop DAC/Amp + Philips Fidelio X3 headphones, or ARTTI T10 Planar IEMs
Power Supply ADATA XPG CORE Reactor 650 W 80+ Gold ATX
Mouse Roccat Kone Pro Air
Keyboard Cooler Master MasterKeys Pro L
Software Windows 10 64-bit Home Edition
Intel CEO Pat Gelsinger engaged with press/media representatives following the conclusion of his IFS Direct Connect 2024 keynote speech—when asked about Team Blue's ongoing relationship with TSMC, he confirmed that their manufacturing agreement has advanced from "5 nm to 3 nm." According to a China Times news article: "Gelsinger also confirmed the expansion of orders to TSMC, confirming that TSMC will hold orders for Intel's Arrow and Lunar Lake CPU, GPU, and NPU chips this year, and will produce them using the N3B process, officially ushering in the Intel notebook platform that the outside world has been waiting for many years." Past leaks have indicated that Intel's Arrow Lake processor family will have CPU tiles based on their in-house 20A process, while TSMC takes care of the GPU tile aspect with their 3 nm N3 process node.

That generation is expected to launch later this year—the now "officially confirmed" upgrade to 3 nm should produce pleasing performance and efficiency improvements. The current crop of Core Ultra "Meteor Lake" mobile processors has struggled with the latter, especially when compared to rivals. Lunar Lake is marked down for a 2025 launch window, so some aspects of its internal workings remain a mystery—Gelsinger has confirmed that TSMC's N3B is in the picture, but no official source has disclosed their in-house manufacturing choice(s) for LNL chips. Wccftech believes that Lunar Lake will: "utilize the same P-Core (Lion Cove) and brand-new E-Core (Skymont) core architecture which are expected to be fabricated on the 20A node. But that might also be limited to the CPU tile. The GPU tile will be a significant upgrade over the Meteor Lake and Arrow Lake CPUs since Lunar Lake ditches Alchemist and goes for the next-gen graphics architecture codenamed "Battlemage" (AKA Xe2-LPG)." Late January whispers pointed to Intel and TSMC partnering up on a 2 nanometer process for the "Nova Lake" processor generation—perhaps a very distant prospect (2026).



View at TechPowerUp Main Site | Source
 
So he confirmed Intel 3 and Intel 20A are inferior to TSMC N3. I wonder who will be so naive to use Intel’s fabs.

"Inferior" means cheaper. I wonder who will be so naive to use TSMC when it charges 20,000$ for a 3 nm wafer, and 25,000 - 30,000$ for a 2 nm wafer.
Those naives are only Apple and Nvidia/Intel. No one else. Not before 2027.
 
Question, is Arrow Lake 15th generation or 16? And what numerical generation will Lunar Lake be?
 
hmm sooo also intel is depend on taiwan,,,)))) niceee time to Chinese do "reunification", aka destroy taiwan.. and Chinese tech inland will skyrocket becouse tsmc fabs in other places like japan will in stable production maybe in 2030, other are dalyed (in usa) and europe is toast)) love CHina really ))
 
Question, is Arrow Lake 15th generation or 16? And what numerical generation will Lunar Lake be?
The gens thing finished with 14th Gen. Meteor Lake is Series 1, Arrow Lake is Series 2, Lunar Lake may be Series 3. Series 1 CPU numbers start with 1, for example 135H. Series 2 CPU numbers start with 2, so you could see 260K, 270K and 290K. Lunar Lake is a Meteor Lake replacement, so if it is Series 3 you will have 135H = Meteor Lake and 335H = Lunar Lake.
 
Last edited:
The gens thing finished with 14th Gen. Meteor Lake is Series 1, Arrow Lake is Series 2, Lunar Lake may be Series 3. Series 1 CPU numbers start with 1, for example 135H. Series 2 CPU numbers start with 2, so you could see 260K, 270K and 290K. Lunar Lake is a Meteor Lake replacement, so if it is Series 3 you will have 135H = Meteor Lake and 335H = Lunar Lake.
Luna Lake is a premium U series class apu meant for sub 28W category. It's not a replacement for the whole Meteor Lake stack. Honestly with Intel having Arrow Lake mobile as well as Meteor Lake and Luna Lake it will all be rather confusing how they position and price them all.
 
For a company that owns so many fabs and makes so much money that’s kind of sad and embarrassing.
 
Question, is Arrow Lake 15th generation or 16? And what numerical generation will Lunar Lake be?
ARL should be following RPL Refresh as the 15th generation of Core on desktop and starting a new socket FCLGA1851. It is unclear if it will be named 15xxx or get a Core Ultra 1xx/2xx name like Meteor Lake. Lunar Lake is a partial successor to Meteor Lake, being a dedicated low-power design. It should be Core Ultra 2xx.
 
is intel capable of producing anything better than a 10nm(reevaluated as 7nm) at all. what are all these talks about partnering, this mean they have become fabless like AMD as far as anything better than 10nm is concerned, yeah they may have some servers on intel 4. but at the same time intel intends to offers capacity to others. I don't get any of this and it doesn't matter in the end.
 
For a company that owns so many fabs and makes so much money that’s kind of sad and embarrassing.
Their Fab improvements stalled, the same way how AMD got hamstrung by GlobalFoundries a decade ago.
 
So he confirmed Intel 3 and Intel 20A are inferior to TSMC N3. I wonder who will be so naive to use Intel’s fabs.
It's not that. It's all about timing. People don't realize how early the manufacturing/development process starts for things like this. Especially considering the packaging.
Not only that, but these deals are made well in advance. It's not like they decided yesterday to buy some fab time at TSMC...

...I guess it is the vogue to FUD it up when it comes to Intel.
 
Their Fab improvements stalled, the same way how AMD got hamstrung by GlobalFoundries a decade ago.
And back then there were no tax dollars to bail them out of it.
 
Seems like an awful lot of people around these parts are incapable of reading, or at the very least understanding what they're reading. Every Arc GPU that has been mass fabricated uses TSMC and these will be no different. The CPU cores in ARL are Intel 20A, GPU TSMC N3, and the SoC/IO will likely be TSMC as they are in MTL. LNL CPU cores are the question mark as there has been word that they're all TSMC which might be due to the integrated DRAM and 20A being high performance only as Intel 4 is.
 
Intel back to buying TSMC fab capacity in order to limit competitor chip manufacturing.
I feel like the main purpose of this is to throw around Intel's financial power, use up capacity, perhaps drive up prices at TSMC and hurt AMD....if you look at Intel's behavior since 2000, pretty much every time AMD has out innovated them, Intel always resorts to just using their vast amount of cash to "compete" by other means.
 
i thought this was set in stone last year?

How is battle mage coming along and when can we see arrow lake
 
The gens thing finished with 14th Gen. Meteor Lake is Series 1, Arrow Lake is Series 2, Lunar Lake may be Series 3. Series 1 CPU numbers start with 1, for example 135H. Series 2 CPU numbers start with 2, so you could see 260K, 270K and 290K. Lunar Lake is a Meteor Lake replacement, so if it is Series 3 you will have 135H = Meteor Lake and 335H = Lunar Lake.
Big thanks for the detailed reply.
 
Isn't N3B the original garbage class 3nm offering from TSMC that only Apple was stupid enough to use to brag they were the first with 3nm. Most sane companies are waiting for N3E.
 
Isn't N3B the original garbage class 3nm offering from TSMC that only Apple was stupid enough to use to brag they were the first with 3nm. Most sane companies are waiting for N3E.
2 years on from those initial problems, tsmc probably found a way to deal with the lower yields
 
"Inferior" means cheaper. I wonder who will be so naive to use TSMC when it charges 20,000$ for a 3 nm wafer, and 25,000 - 30,000$ for a 2 nm wafer.
Those naives are only Apple and Nvidia/Intel. No one else. Not before 2027.
knowing intel, it wouldn't be cheaper
 
Which should be the newer and refined N3E. Would you want the stigma of N3B name? At least call it N3BP or such.
They aren't selling chips to a wide public where that matters.
They are selling to intel and other giant in the industry.

Also, yes it's possible there is a letter behind the b and the interviewer didn't hear it because it was N3BE or what ever
 
Back
Top