• Welcome to TechPowerUp Forums, Guest! Please check out our forum guidelines for info related to our community.

Not Just TSMC, Even Samsung Running Behind Schedule with its U.S. Fab

btarunr

Editor & Senior Moderator
Staff member
Joined
Oct 9, 2007
Messages
47,538 (7.47/day)
Location
Hyderabad, India
System Name RBMK-1000
Processor AMD Ryzen 7 5700G
Motherboard ASUS ROG Strix B450-E Gaming
Cooling DeepCool Gammax L240 V2
Memory 2x 8GB G.Skill Sniper X
Video Card(s) Palit GeForce RTX 2080 SUPER GameRock
Storage Western Digital Black NVMe 512GB
Display(s) BenQ 1440p 60 Hz 27-inch
Case Corsair Carbide 100R
Audio Device(s) ASUS SupremeFX S1220A
Power Supply Cooler Master MWE Gold 650W
Mouse ASUS ROG Strix Impact
Keyboard Gamdias Hermes E2
Software Windows 11 Pro
Delays in the construction of its U.S. based semiconductor fab may have just cost the Chairman of TSMC his job, but the Koreans aren't faring any better. BusinessKorea reports that Samsung Electronics has pushed the timeline for mass-production in its upcoming Austin Texas-based fab to 2025. Its construction was originally slated to be complete by now, with risk production and testing through early 2024, and mass production later in the year, which has all been pushed to 2025. The company now hopes to push its first wafer toward the end of 2024, with mass production expected some time in 2025.

Samsung reportedly blames issues with U.S. Government subsidies and regulatory problems behind the delays. A key aspect of getting cutting edge Asian foundries such as TSMC and Samsung to invest in the U.S. had to do with government subsidies to help these fabs overcome the uphill task of doing so Stateside and making the venture profitable. The U.S. had a sense of urgency in bringing these companies over, as it saw a potential conflict across the Taiwan straits, which threatened to disrupt practically the entire global digital economy. The company's first production line in this foundry was expected to be 4 nm EUV FinFET. It remains to be seen just how relevant and cutting edge 4 nm EUV is in 2025, as both TSMC and Intel hope to have Nanosheet transistors and nodes such as the TSMC N2 and Intel 20A taking shape by then.



View at TechPowerUp Main Site | Source
 
Joined
Jan 3, 2021
Messages
3,953 (2.58/day)
Location
Slovenia
Processor i5-6600K
Motherboard Asus Z170A
Cooling some cheap Cooler Master Hyper 103 or similar
Memory 16GB DDR4-2400
Video Card(s) IGP
Storage Samsung 850 EVO 250GB
Display(s) 2x Oldell 24" 1920x1200
Case Bitfenix Nova white windowless non-mesh
Audio Device(s) E-mu 1212m PCI
Power Supply Seasonic G-360
Mouse Logitech Marble trackball, never had a mouse
Keyboard Key Tronic KT2000, no Win key because 1994
Software Oldwin
Buy electronics while chips are cheap. If anyone thinks they aren't, just wait until backside power delivery, ribbonFET, forksheets, high-NA, CFET, and real 3D packaging enter mass manufacturing.
 
Joined
Nov 27, 2023
Messages
3,086 (6.51/day)
System Name The Workhorse
Processor AMD Ryzen R9 5900X
Motherboard Gigabyte Aorus B550 Pro
Cooling CPU - Noctua NH-D15S Case - 3 Noctua NF-A14 PWM at the bottom, 2 Fractal Design 180mm at the front
Memory GSkill Trident Z 3200CL14
Video Card(s) NVidia GTX 1070 MSI QuickSilver
Storage Adata SX8200Pro
Display(s) LG 32GK850G
Case Fractal Design Torrent (Solid)
Audio Device(s) FiiO E-10K DAC/Amp, Samson Meteorite USB Microphone
Power Supply Corsair RMx850 (2018)
Mouse Razer Viper (Original) on a X-Raypad Equate Plus V2
Keyboard Cooler Master QuickFire Rapid TKL keyboard (Cherry MX Black)
Software Windows 11 Pro (24H2)
I mean, who would have thought that creating bleeding edge foundries on demand with the deadline being "we need it yesterday" would be somewhat of a tough task.
 
Joined
Jul 30, 2019
Messages
3,511 (1.71/day)
System Name Still not a thread ripper but pretty good.
Processor Ryzen 9 7950x, Thermal Grizzly AM5 Offset Mounting Kit, Thermal Grizzly Extreme Paste
Motherboard ASRock B650 LiveMixer (BIOS/UEFI version P3.08, AGESA 1.2.0.2)
Cooling EK-Quantum Velocity, EK-Quantum Reflection PC-O11, D5 PWM, EK-CoolStream PE 360, XSPC TX360
Memory Micron DDR5-5600 ECC Unbuffered Memory (2 sticks, 64GB, MTC20C2085S1EC56BD1) + JONSBO NF-1
Video Card(s) XFX Radeon RX 5700 & EK-Quantum Vector Radeon RX 5700 +XT & Backplate
Storage Samsung 4TB 980 PRO, 2 x Optane 905p 1.5TB (striped), AMD Radeon RAMDisk
Display(s) 2 x 4K LG 27UL600-W (and HUANUO Dual Monitor Mount)
Case Lian Li PC-O11 Dynamic Black (original model)
Audio Device(s) Corsair Commander Pro for Fans, RGB, & Temp Sensors (x4)
Power Supply Corsair RM750x
Mouse Logitech M575
Keyboard Corsair Strafe RGB MK.2
Software Windows 10 Professional (64bit)
Benchmark Scores RIP Ryzen 9 5950x, ASRock X570 Taichi (v1.06), 128GB Micron DDR4-3200 ECC UDIMM (18ASF4G72AZ-3G2F1)
If you want delays in your project and wasteful spending just get the U.S. Government involved. :rolleyes:
 
Joined
Jan 25, 2020
Messages
2,286 (1.22/day)
System Name GrandadsBadAss
Processor I7 13700k w/ HEATKILLER IV PRO Copper Nickel
Motherboard MSI Z790 Tomahawk Wifi
Cooling BarrowCH Boxfish 200mm-HWLabs SR2 420/GTS 360-BP Dual D5 MOD TOP- 2x Koolance PMP 450S
Memory 2x16gb G.SKILL Trident Z5 Neo RGB 6400
Video Card(s) Asrock 6800xt PG D w/ Byski A-AR6900XT-X
Storage WD SN850x 1TB NVME M.2/Samsung 980 Pro 1TB NVMe M.2
Display(s) Acer XG270HU
Case Phanteks Enthoo Pro 2 Server Edition w/3 Noctua NF-A14 2000 IP67/4 be quiet! LIGHT WINGS LX 120mm
Audio Device(s) Klipsch ProMedia 2.1
Power Supply FSP Hydro Ti PRO 1000w
Mouse Logitech G502
Keyboard Roccat Vulcan Aimo
Software Win 10/11pro
If you want delays in your project and wasteful spending just get ANY Government involved. :rolleyes:
Fixed that for ya ;)

Any bureaucracy (city, state, fed, what have you)involved in high dollar business decisions is just asking for it right up the wazoo. Either get your funding wrapped up on the front end in iron clad, bullet proof contracts, or run the funk away.
 
Joined
Dec 29, 2010
Messages
3,849 (0.74/day)
Processor AMD 5900x
Motherboard Asus x570 Strix-E
Cooling Hardware Labs
Memory G.Skill 4000c17 2x16gb
Video Card(s) RTX 3090
Storage Sabrent
Display(s) Samsung G9
Case Phanteks 719
Audio Device(s) Fiio K5 Pro
Power Supply EVGA 1000 P2
Mouse Logitech G600
Keyboard Corsair K95
US senators be like, here's my money where's my fab?
 
Joined
Dec 26, 2006
Messages
4,021 (0.60/day)
Location
Northern Ontario Canada
Processor Ryzen 5700x
Motherboard Gigabyte X570S Aero G R1.1 BiosF5g
Cooling Noctua NH-C12P SE14 w/ NF-A15 HS-PWM Fan 1500rpm
Memory Micron DDR4-3200 2x32GB D.S. D.R. (CT2K32G4DFD832A)
Video Card(s) AMD RX 6800 - Asus Tuf
Storage Kingston KC3000 1TB & 2TB & 4TB Corsair MP600 Pro LPX
Display(s) LG 27UL550-W (27" 4k)
Case Be Quiet Pure Base 600 (no window)
Audio Device(s) Realtek ALC1220-VB
Power Supply SuperFlower Leadex V Gold Pro 850W ATX Ver2.52
Mouse Mionix Naos Pro
Keyboard Corsair Strafe with browns
Software W10 22H2 Pro x64
Fixed that for ya ;)

Any bureaucracy (city, state, fed, what have you)involved in high dollar business decisions is just asking for it right up the wazoo. Either get your funding wrapped up on the front end in iron clad, bullet proof contracts, or run the funk away.
Which includes big business.............many layers there as well......................especially when there are 10 different subs which are also big businesses.

edit - Austin Texas-based
hopefully Texas is shoring up its power grid..........................
 
Joined
Jan 25, 2020
Messages
2,286 (1.22/day)
System Name GrandadsBadAss
Processor I7 13700k w/ HEATKILLER IV PRO Copper Nickel
Motherboard MSI Z790 Tomahawk Wifi
Cooling BarrowCH Boxfish 200mm-HWLabs SR2 420/GTS 360-BP Dual D5 MOD TOP- 2x Koolance PMP 450S
Memory 2x16gb G.SKILL Trident Z5 Neo RGB 6400
Video Card(s) Asrock 6800xt PG D w/ Byski A-AR6900XT-X
Storage WD SN850x 1TB NVME M.2/Samsung 980 Pro 1TB NVMe M.2
Display(s) Acer XG270HU
Case Phanteks Enthoo Pro 2 Server Edition w/3 Noctua NF-A14 2000 IP67/4 be quiet! LIGHT WINGS LX 120mm
Audio Device(s) Klipsch ProMedia 2.1
Power Supply FSP Hydro Ti PRO 1000w
Mouse Logitech G502
Keyboard Roccat Vulcan Aimo
Software Win 10/11pro
US senators be like, here's my money where's my fab?
Usually right after their obligatory photo op at said fab construction site, with chromed shovel in hand. Dur
 
Joined
Jul 7, 2019
Messages
974 (0.47/day)
Which includes big business.............many layers there as well......................especially when there are 10 different subs which are also big businesses.

edit - Austin Texas-based
hopefully Texas is shoring up its power grid..........................
They aren't. They passed a budget to increase power generation and weather hardening, but the money just went to pay off the CEOs of existing power providers while not actually doing anything. Which is why Texas still had brownouts during some of the nastier heat/cold fronts that passed through this year, on top of power provider-provided thermostats forcibly overriding users inputs to limit demand.

About the only thing growing in Texas power-wise are a few more solar and wind plants, but neither are winterized (have heating elements) and construction progress is slowing down now that Texas is afraid of wind power overtaking gas power (it's already on par, based on the average output).
 
Joined
Feb 20, 2020
Messages
9,340 (5.05/day)
Location
Louisiana
System Name Ghetto Rigs z490|x99|Acer 17 Nitro 7840hs/ 5600c40-2x16/ 4060/ 1tb acer stock m.2/ 4tb sn850x
Processor 10900k w/Optimus Foundation | 5930k w/Black Noctua D15
Motherboard z490 Maximus XII Apex | x99 Sabertooth
Cooling oCool D5 res-combo/280 GTX/ Optimus Foundation/ gpu water block | Blk D15
Memory Trident-Z Royal 4000c16 2x16gb | Trident-Z 3200c14 4x8gb
Video Card(s) Titan Xp-water | evga 980ti gaming-w/ air
Storage 970evo+500gb & sn850x 4tb | 860 pro 256gb | Acer m.2 1tb/ sn850x 4tb| Many2.5" sata's ssd 3.5hdd's
Display(s) 1-AOC G2460PG 24"G-Sync 144Hz/ 2nd 1-ASUS VG248QE 24"/ 3rd LG 43" series
Case D450 | Cherry Entertainment center on Test bench
Audio Device(s) Built in Realtek x2 with 2-Insignia 2.0 sound bars & 1-LG sound bar
Power Supply EVGA 1000P2 with APC AX1500 | 850P2 with CyberPower-GX1325U
Mouse Redragon 901 Perdition x3
Keyboard G710+x3
Software Win-7 pro x3 and win-10 & 11pro x3
Benchmark Scores Are in the benchmark section
Hi,
Intel is such a wasteful company half their products should of never left the lab but did
Worst thing us gov should do is subsidize anything intel does.

AMD seems to be the opposite of ewaste intel.
 
Joined
Dec 26, 2006
Messages
4,021 (0.60/day)
Location
Northern Ontario Canada
Processor Ryzen 5700x
Motherboard Gigabyte X570S Aero G R1.1 BiosF5g
Cooling Noctua NH-C12P SE14 w/ NF-A15 HS-PWM Fan 1500rpm
Memory Micron DDR4-3200 2x32GB D.S. D.R. (CT2K32G4DFD832A)
Video Card(s) AMD RX 6800 - Asus Tuf
Storage Kingston KC3000 1TB & 2TB & 4TB Corsair MP600 Pro LPX
Display(s) LG 27UL550-W (27" 4k)
Case Be Quiet Pure Base 600 (no window)
Audio Device(s) Realtek ALC1220-VB
Power Supply SuperFlower Leadex V Gold Pro 850W ATX Ver2.52
Mouse Mionix Naos Pro
Keyboard Corsair Strafe with browns
Software W10 22H2 Pro x64
They aren't. They passed a budget to increase power generation and weather hardening, but the money just went to pay off the CEOs of existing power providers while not actually doing anything. Which is why Texas still had brownouts during some of the nastier heat/cold fronts that passed through this year, on top of power provider-provided thermostats forcibly overriding users inputs to limit demand.

About the only thing growing in Texas power-wise are a few more solar and wind plants, but neither are winterized (have heating elements) and construction progress is slowing down now that Texas is afraid of wind power overtaking gas power (it's already on par, based on the average output).
That's too bad. I think (personally) that electric utility(s) should be a federal entity, it would probably be more robust and the whole country would be tied together. Here in Canada, they are provincial and ran by each province, which is decent given the size of the provinces. I think it would be beneficial to have a coast-to-coast backbone line.
 
Joined
Feb 20, 2020
Messages
9,340 (5.05/day)
Location
Louisiana
System Name Ghetto Rigs z490|x99|Acer 17 Nitro 7840hs/ 5600c40-2x16/ 4060/ 1tb acer stock m.2/ 4tb sn850x
Processor 10900k w/Optimus Foundation | 5930k w/Black Noctua D15
Motherboard z490 Maximus XII Apex | x99 Sabertooth
Cooling oCool D5 res-combo/280 GTX/ Optimus Foundation/ gpu water block | Blk D15
Memory Trident-Z Royal 4000c16 2x16gb | Trident-Z 3200c14 4x8gb
Video Card(s) Titan Xp-water | evga 980ti gaming-w/ air
Storage 970evo+500gb & sn850x 4tb | 860 pro 256gb | Acer m.2 1tb/ sn850x 4tb| Many2.5" sata's ssd 3.5hdd's
Display(s) 1-AOC G2460PG 24"G-Sync 144Hz/ 2nd 1-ASUS VG248QE 24"/ 3rd LG 43" series
Case D450 | Cherry Entertainment center on Test bench
Audio Device(s) Built in Realtek x2 with 2-Insignia 2.0 sound bars & 1-LG sound bar
Power Supply EVGA 1000P2 with APC AX1500 | 850P2 with CyberPower-GX1325U
Mouse Redragon 901 Perdition x3
Keyboard G710+x3
Software Win-7 pro x3 and win-10 & 11pro x3
Benchmark Scores Are in the benchmark section
Hi,
Single payer rarely has low rates and those rates never go down lol

Texas say what you want about the big freeze deal I was there in Houston
My rate was fixed and very low about .10c per kw for 3 years which is really unheard of anywhere else on the planet :laugh:
Look at rates and they were north of 20c kw
People on variable rates were screwed because they were greedy
Blackouts hell just look at very liberal California they have them weekly :roll:
 
Top