August has been a long month, and it's been a long time coming.
Back in early-August, I ended up delaying the purchase of the
DL580 Gen9. This threw a wrench into my previous plans since I had the Gen9 planned with over 300GB of RAM. I was depending on the larger pool of RAM being available for things like OSRM, YaCy, Android VM, etc. The first thing I did was update Windows Server 2016 to 2019. I finally got dark theme, but my previous license had to be replaced. Still a little peeved about that unexpected cost. Kicked out Technitium DNS since it was redundant to AD DNS at this point, and added OCCWeb to Nextcloud for easier updates in the future (running commands after initial update).
At about half-way through August, I decided to put OSRM on the table. After a bunch of
reading,
interpreting,
getting help, and
guessing, I finished figuring out that thing late last week. Didn't even find
this page until I was near the end. I'd say kill the page being used on Docker Hub for OSRM and replace it with that instead. Would have saved me a ton of time last month! By the way, I ran into
this little issue in the middle of troubleshooting OSRM. No biggie, finally finished getting OSRM to work at the end of August.
I was supposed to get started with FreePBX back in August, so the I could work primarily on YaCy this month and into October. That's not going to happen. At least I managed to shove RustDesk in there somehow. I also had to re-build xBrowserSync, since I accidentally broke that container while trying to change its IP address. Also had time to setup GPO for local admin account(s). So it wasn't a complete bust in falling behind.
Still need to look into
using custom tile servers with Nextcloud Maps (unknown) and PhoneTrack (yes), finish setting up FreePBX, switch Google Voice to VoIP.ms (port my number over), start working on YaCy Grid, Convert Windows Server and Windows 10 VMs to GPT/UEFI, Update Nextcloud, and buy a bigger SSD for my current laptop. Wait - almost forgot that I need more EaseUS backup licenses for my setup. This all needs to happen before mid-2023, preferably.
I'm also considering doing a clean install of Artix OpenRC, due to a
small issue I've been having since 2021. On the bright side, I kinda want a new desk and
rack!
Something tells me that I'm more than a month behind XD