• Welcome to TechPowerUp Forums, Guest! Please check out our forum guidelines for info related to our community.

Intel 10A (1 nm-class) Node to Enter Mass Production in 2027

Joined
May 25, 2022
Messages
128 (0.14/day)
From the TPU article in the link above:

“According to a China Times news article: "Gelsinger also confirmed the expansion of orders to TSMC, confirming that TSMC will hold orders for Intel's Arrow and Lunar Lake CPU, GPU, and NPU chips this year, and will produce them using the N3B process.”

“Past leaks have indicated that Intel's Arrow Lake processor family will have CPU tiles based on their in-house 20A process, while TSMC takes care of the GPU tile aspect with their 3 nm N3 process node.”
Simple. Some are on 20A and some are on N3.
Intels 20A factory in germany should be up and running, I guess we will see if Arrow Lake will use 20A or not later this year, might be Intel 4
Nothing outside of Meteorlake and the Ericsson SoC is, will be Intel 4. Arrowlake will be 20A and N3 for compute tile.
They are not abandoning their existing fabs. They have to use TSMC while they upgrade/rebuild some them to spead out their workload.
Someone actually using their brain. The whole in-house-or-nothing mentality is hurtful in the short term when they are trying to make sure neither the process team nor the design team gets hampered by delays of each other.
 
Joined
Jan 3, 2021
Messages
3,612 (2.49/day)
Location
Slovenia
Processor i5-6600K
Motherboard Asus Z170A
Cooling some cheap Cooler Master Hyper 103 or similar
Memory 16GB DDR4-2400
Video Card(s) IGP
Storage Samsung 850 EVO 250GB
Display(s) 2x Oldell 24" 1920x1200
Case Bitfenix Nova white windowless non-mesh
Audio Device(s) E-mu 1212m PCI
Power Supply Seasonic G-360
Mouse Logitech Marble trackball, never had a mouse
Keyboard Key Tronic KT2000, no Win key because 1994
Software Oldwin
Someone actually using their brain. The whole in-house-or-nothing mentality is hurtful in the short term when they are trying to make sure neither the process team nor the design team gets hampered by delays of each other.
It's also about capacity planning. How many processors are we planning to sell in each quarter of 2025 and 2026? What will our fab capacity be in each quarter? Not enough, just enough or too much?
 
Joined
Jul 5, 2013
Messages
28,272 (6.75/day)
Simple. Some are on 20A and some are on N3.

Nothing outside of Meteorlake and the Ericsson SoC is, will be Intel 4. Arrowlake will be 20A and N3 for compute tile.

Someone actually using their brain. The whole in-house-or-nothing mentality is hurtful in the short term when they are trying to make sure neither the process team nor the design team gets hampered by delays of each other.
It's also about capacity planning. How many processors are we planning to sell in each quarter of 2025 and 2026? What will our fab capacity be in each quarter? Not enough, just enough or too much?
Exactly. Intel is not stupid. They're taking advantage of a third party fab so they can upgrade and rebuild their own fabs. Not just good planning but very smart.
 
Joined
Sep 15, 2011
Messages
6,762 (1.39/day)
Processor Intel® Core™ i7-13700K
Motherboard Gigabyte Z790 Aorus Elite AX
Cooling Noctua NH-D15
Memory 32GB(2x16) DDR5@6600MHz G-Skill Trident Z5
Video Card(s) ZOTAC GAMING GeForce RTX 3080 AMP Holo
Storage 2TB SK Platinum P41 SSD + 4TB SanDisk Ultra SSD + 500GB Samsung 840 EVO SSD
Display(s) Acer Predator X34 3440x1440@100Hz G-Sync
Case NZXT PHANTOM410-BK
Audio Device(s) Creative X-Fi Titanium PCIe
Power Supply Corsair 850W
Mouse Logitech Hero G502 SE
Software Windows 11 Pro - 64bit
Benchmark Scores 30FPS in NFS:Rivals
Someone posted a good youtube video explaining this a few days ago.

Edit: here it is

That's by far the most annoying video and voice from all Youtube and Internets. Sorry, but was torture to hear her for more than 30 secs.
 
Joined
Jul 5, 2013
Messages
28,272 (6.75/day)
Sorry, but was torture to hear her for more than 30 secs.
I hadn't watched it yet. You are not wrong. She's as cute as can be, but that voice.. I would go insane in the membrane if subjected to that for more than a few minutes.. Can you imagine if she was a screamer? I would never want to get busy again.. Or would laugh my ass off..
 
Joined
Dec 31, 2020
Messages
1,005 (0.69/day)
Processor E5-4627 v4
Motherboard VEINEDA X99
Memory 32 GB
Video Card(s) 2080 Ti
Storage NE-512
Display(s) G27Q
Case DAOTECH X9
Power Supply SF450
Makes sense since n+1 and n+2 are probably used for GPU and SOC tiles and n+3 for CPU tiles. once built factories need to co-exist to recoup the investment and get the most value out of them.
 
Joined
Aug 10, 2020
Messages
335 (0.21/day)
Intel will be using the same lithography for sub Intel 7 geometries as TSMC has been using for their 3-7nm. They are not as far behind as you think. Lithography is the technology (ie EUV) used for patterning step of fabricating. Transitioning to EUV is basically mandatory to keep improving density. All major fabs have basically moved to EUV for sub 7nm geos.

For the record, Intel 7 has a smaller fin pitch than TSMC 7 even though its channel length (where traditionally transistors get their sizes) is longer. Intel 7 is also comparable in density as TSMC 7 because the fin pitch is less. Kind of why they call it Intel 7. It used to be their Superfin 10, but recent improvements too it makes it their 7. Its just kind of bad perf/watt.

Basically, saying something is Xnm doesnt mean shit these days due to transistor structures being very different than they used to be and largely marketting now. Transistors can be the same size from say TSMC 7 to TSMC 6, but to make it TSMC 6 they just say its density is improved, perf/watt is better, area better but transistors themselves didnt change. There could even be another flavor of cell that has different VT characteristics added to the library.

I undersanding that but they are still 5 years behind, we need HEDT parts with Intel 4 lithography or newer to catch up. Zen 5 is rumored to be on TSMC 3N. Intel performance per watt is appalling right now.
 

MxPhenom 216

ASIC Engineer
Joined
Aug 31, 2010
Messages
13,010 (2.49/day)
Location
Loveland, CO
System Name Ryzen Reflection
Processor AMD Ryzen 9 5900x
Motherboard Gigabyte X570S Aorus Master
Cooling 2x EK PE360 | TechN AM4 AMD Block Black | EK Quantum Vector Trinity GPU Nickel + Plexi
Memory Teamgroup T-Force Xtreem 2x16GB B-Die 3600 @ 14-14-14-28-42-288-2T 1.45v
Video Card(s) Zotac AMP HoloBlack RTX 3080Ti 12G | 950mV 1950Mhz
Storage WD SN850 500GB (OS) | Samsung 980 Pro 1TB (Games_1) | Samsung 970 Evo 1TB (Games_2)
Display(s) Asus XG27AQM 240Hz G-Sync Fast-IPS | Gigabyte M27Q-P 165Hz 1440P IPS | LG 24" IPS 1440p
Case Lian Li PC-011D XL | Custom cables by Cablemodz
Audio Device(s) FiiO K7 | Sennheiser HD650 + Beyerdynamic FOX Mic
Power Supply Seasonic Prime Ultra Platinum 850
Mouse Razer Viper v2 Pro
Keyboard Corsair K65 Plus 75% Wireless - USB Mode
Software Windows 11 Pro 64-Bit
I undersanding that but they are still 5 years behind, we need HEDT parts with Intel 4 lithography or newer to catch up. Zen 5 is rumored to be on TSMC 3N. Intel performance per watt is appalling right now.
They arent 5 years behind tho....

And if you dont let boards unload as much power as they want to the CPU that the CPU does not need, their perf/watt isnt actually that bad.
 
Last edited:
Joined
May 3, 2018
Messages
2,881 (1.19/day)
I undersanding that but they are still 5 years behind, we need HEDT parts with Intel 4 lithography or newer to catch up. Zen 5 is rumored to be on TSMC 3N. Intel performance per watt is appalling right now.
LOL. Intel has already taped out Clearwater Forest on 18A. I'm no Intel fanboy, all AMD products for me, but Intel is clearly progressing rapidly on their process nodes and is rapidly catching up to TSMC. This is great news as TSMC needs a healthy kick up the arse. Hopefully serial over-hyper and under-deliverer Scamsung can get their shit together with 2nm as well. Having 3 major players would be good news for the global chip market and consumers.
 
Joined
May 25, 2022
Messages
128 (0.14/day)
I undersanding that but they are still 5 years behind, we need HEDT parts with Intel 4 lithography or newer to catch up. Zen 5 is rumored to be on TSMC 3N. Intel performance per watt is appalling right now.
They are not 5 years behind. Sierra Forest is coming in less than 3 months using Intel 3. Whatever site you are reading from they are wrong.
 

Godlygamer23

New Member
Joined
Jan 4, 2024
Messages
7 (0.02/day)
Um...

...hmmm.

I am not getting into that pedantic debate..
It's not being pedantic - it is objective reality. The marketing claims made by companies regarding their transistor lithography are pointless, and it's pointless to directly compare them by name alone because no feature on the transistor actually matches that value - even if it matches some other transistor, like a planar transistor at some size(1nm referenced here in the article for Intel 10A), not every company is going to use the same method of arriving at the conclusion for their name.

So again, comparing transistor lithographies between companies is totally pointless.

Even looking at Intel 10A, it's obvious that most of the time, they're moving the decimal over. So Intel 20A is likely a "2nm-class" transistor lithography.
 
Joined
Aug 10, 2020
Messages
335 (0.21/day)
They are not 5 years behind. Sierra Forest is coming in less than 3 months using Intel 3. Whatever site you are reading from they are wrong.

Nothing I said is wrong, the current Intel HEDT CPUs are 5 years behind. They are still on Intel 7 process and that's why AMD leads them by 3x the performance per watt in some cases with 7900X and 7800X3D. They need to release Intel 4 lithography based HEDT CPUs asap, their new fab is MIA once again.
 
Top