News Posts matching #Intel Unleashed

Return to Keyword Browsing

Intel to Outsource a Part of 2023 Processor Production to TSMC

Intel's problems with processor production, especially with newer nodes like 10 nm and 7 nm, have been widely known. The company has not been able to deliver the latest semiconductor process on time and has thus delayed many product launches. However, things are looking to take a complete U-turn and the hell will freeze. During the "Intel Unleashed: Engineering the Future" webcast event that happened yesterday, the company made several announcements regarding the 7 nm process and its viability. We have already reported that the company is working on the new Meteor Lake processor lineup for 2023, supposed to be manufactured on the fixed 7 nm node.

However, it seems like Intel will have to tap external capacities to manufacture a part of its processor production. The company has confirmed that it will use an unknown TSMC process to manufacture a part of the 2023 processor lineup. That means that Intel and TSMC have already established the needed capacity and that TSMC has already booked wafer capacity for Intel. This has never happened before, as Intel always kept its processor production under the company roof. However, given that there is a huge demand for new semiconductor processes, Intel has to look at external manufacturing options to keep up with the demand.

HPE Lists 40-Core Intel Ice Lake-SP Xeon Server Processor

Hewlett Packard Enterprise, the company focused on making enterprise hardware and software, has today mistakenly listed some of Intel's upcoming 3rd generation Xeon Scalable processors. Called Ice Lake-SP, the latest server processor generation is expected to launch sometime in the coming days, with a possible launch date being the March 23rd "Intel Unleashed" webcast. The next generation of processors will finally bring a new vector of technologies Intel needs in server space. That means the support for PCIe 4.0 protocol for higher speed I/O and octa-channel DDR4 memory controller for much greater bandwidth. The CPU lineup will for the first time use Intel's advanced 10 nm node called 10 nm SuperFin.

Today, in the leaked HPE listing, we get to see some of the Xeon models Intel plans to launch. Starting from 32-core models, all the way to 40-core models, all SKUs above 28 cores are supposed to use dual die configuration to achieve high core counts. The limit of a single die is 28 cores. HPE listed a few models, with the highest-end one being the Intel Xeon Platinum XCC 8380 processor. It features 40 cores with 80 threads and a running frequency of 2.3 GHz. If you are wondering about TDP, it looks like the 10 nm SuperFin process is giving good results, as the CPU is rated only for 270 Watts of power.

Intel CEO Pat Gelsinger Announces "Intel Unleashed" Webcast on March 23rd

Recently appointed Intel CEO Pat Gelsinger has announced via Twitter that the company will be holding a webcast on March 23rd - likely in the toes of Rocket Lake's actual release, which is expected towards the end of the month. The webcast, titled "Intel Unleashed", seems to serve as the premier event with Pat Gelsinger firmly entrenched on Intel's reins, and should be a tour de force for Intel's strengths, planned execution on product development and release, and growth opportunities - and, if we're being honest, a frontal recognizance of Intel's current weaknesses. for now, the only information Pat Gelsinger put forwards is that this is a business update, and that "exciting things" are coming in 2021.
Return to Keyword Browsing
Dec 22nd, 2024 08:57 EST change timezone

New Forum Posts

Popular Reviews

Controversial News Posts